Advanced training in the interests of admission to work that affects the safety of capital construction projects. Nostroy attestation Nostroy educational testing and certification

Training testing NOSTROY http://nostroyatt.ru/start/#!training

Testing of managers and specialists of the construction complex is a prerequisite for the certification of specialists and obtaining permits for the implementation construction works.

Testing is carried out in accordance with the "Grouping of types of construction works by tests for certification purposes", approved by the Decision of the Committee for professional education National Association of Builders, protocol No. 11 dated 03/29/2011 (as amended by the decision of the Committee for Vocational Education of the National Association of Builders, protocol No. 14 dated 08/15/2011)

To pass testing in the unified certification system of the National Association of Builders, you must submit the following documents for registration of your employees on the website of the National Association of Builders for the purpose of certification:

1. written application for certification;

2. a copy of the passport (with a residence permit);

3. a copy of the document confirming the completion of advanced training, retraining for the relevant type (types) of construction work;

4. a copy of a document confirming the availability of the relevant specialized higher or secondary vocational education.


Names of tests

1. General construction works

1.1. Preparatory work

1.2. Excavation

1.3. Well construction

1.4. Pile work

1.5. Artificial fixation of soils

1.6. Installation and arrangement of concrete, reinforced concrete, prefabricated concrete, prefabricated reinforced concrete, and monolithic structures

1.7. Device work stone structures

1.8. Mounting metal structures

1.9. Mounting wooden structures

1.10. Protection building structures

1.11. Roofing

1.12. Facade works

1.13. Geodetic works

2. Mounting and commissioning works handling equipment

2.1. Installation and commissioning of lifting and transport equipment in the direction of "Elevators"

2.2. Installation and commissioning of other lifting and transport equipment.

3. Installation of equipment for power plants, hydraulic structures

4. Installation and commissioning in the field of heat and gas supply of ventilation, air conditioning, refrigeration units

4.1. Installation and commissioning works in the field of heat and gas supply

4.2. Installation and commissioning in the field of air conditioning and refrigeration

5. Installation and commissioning in the area fire safety, power supply, telemechanics and automation

6. Installation of equipment for healthcare institutions and medical industry enterprises

7. Installation and commissioning at the facilities of the oil and gas and chemical complex

8. Installation of equipment at metallurgy enterprises

9. Installation of underground construction equipment

10. Installation of equipment railway transport

11. Installation of equipment and commissioning of water supply and sewerage facilities

12. Installation and commissioning of equipment of enterprises industrial production

12.1. Installation of equipment for pulp and paper industry and building materials

12.2. Installation of equipment for textile, printing and cinematography enterprises

12.3. Installation of equipment Food Industry and agricultural industries, including fish processing

12.4. Installation of equipment for electronics and communications industries

12.5. Commissioning of equipment for processing and finishing wood

13. Installation of equipment for social and cultural facilities

14. Installation of equipment for space and aviation infrastructure

15. Commissioning of electrical equipment

16. Commissioning of machine lines and metal-cutting machines

17. Arrangement of water supply and sewerage networks "

17.1. Arrangement of internal water supply systems and sewerage of buildings and structures

17.2. Installation of external water supply and sewerage networks

18. Arrangement of heat supply systems for buildings and structures

18.1. Arrangement of internal heating networks

18.2. Installation of external heat supply networks up to 115 degrees Celsius

18.3. The device of external heat supply networks 115 degrees Celsius and above

19. Arrangement of gas supply systems for buildings and structures

19.1. Arrangement of internal gas supply systems

19.2. Arrangement of networks and systems of gas supply with working pressure up to 0.3 MPa inclusive

19.3. Installation of external gas supply networks with operating pressure from 0.3 MPa to 1.2 MPa inclusive (for natural gas), up to 1.6 MPa inclusive (for liquefied petroleum gas)

20. Device of power supply networks

20.1. Arrangement of internal power supply networks

20.2. Arrangement of external power supply networks with voltage up to 1 kV inclusive

20.3. Arrangement of external power supply networks with voltage up to 330 kV inclusive

20.4. Arrangement of external power supply networks with a voltage of more than 330 kV

20.5. Electrification railways

21. Mounting and dismantling of supports for overhead lines

21.1. Installation and dismantling of supports for overhead power lines with voltage up to 35 kV

21.2. Installation and dismantling of supports for overhead power lines with voltage up to 500 kV

21.3. Installation and dismantling of supports for overhead power lines with a voltage of more than 500 kV

22. Installation and dismantling of wires and lightning protection cables of overhead power lines and transformer substations

22.1. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage up to 35 kV inclusive

22.2. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage over 35 kV

22.3. Installation and dismantling of transformer substations and linear electrical equipment with voltage up to 35 kV inclusive

22.4. Installation and dismantling of transformer substations and linear electrical equipment with voltage over 35 kV

23. Underground construction

23.1. Arrangement of tunnels, subways

23.2. Construction of mine structures

24. Transport construction

24.1. Arrangement of roads and airfields

24.2. Arrangement of railway and tram tracks

24.3. Arrangement of bridges, flyovers and overpasses

25. Hydraulic works

26. Diving work

27. Industrial furnaces and chimneys

28. Drilling and blasting during construction

29. Special works for the protection of building structures and equipment

30. Arrangement of external communication lines, including telephone, radio and television

31. Installation of equipment for communication facilities.

32. Construction control over general construction works

33. Construction control over well construction works

34. Construction control over drilling and blasting

35. Construction control over works in the field of water supply and sewerage

36. Construction control over work in the field of heat and gas supply and ventilation

37. Construction control over work in the field of fire safety

38. Construction control over works in the field of power supply

39. Construction control during construction, reconstruction and overhaul of communication facilities

40. Construction control during construction, reconstruction and overhaul of oil and gas industry facilities

41. Construction control during the construction, reconstruction and overhaul of roads and airfields, bridges, flyovers and overpasses

42. Construction control during the construction of railway and tram tracks

43. Construction control during construction, reconstruction, overhaul in underground conditions

44. Construction control over hydraulic engineering and diving operations

45. Construction control during construction, reconstruction and overhaul of industrial furnaces and chimneys

46.1. Works on the organization of construction (head, deputy head of the organization)

46.2. Works on the organization of construction (Head of VET, Deputy Head of VET)

46.3. Works on the organization of construction (line worker)

47. Drilling, construction and installation of oil and gas wells

48. Pipeline protection works

48.1 Insulation work for pipelines

48.2 Electrochemical pipeline protection device

49. Arrangement of main and field pipelines

49.1 Installation of main and field pipelines

49.2 Installation of surface structures of main pipelines

50. Development of offshore oil and gas fields

51. Quality control welded joints and their isolation

52. Arrangement of crossing structures for main and field pipelines

53. Works on the construction of crossings by the method of directional drilling

54. Works on the construction of facilities with nuclear installations
55. Work on the construction of nuclear weapons facilities
56. Works on the construction of objects of elementary particle accelerators and hot chambers
57. Works on the construction of storage facilities for nuclear materials and radioactive substances, storage facilities for radioactive waste
58. Works on the construction of nuclear fuel cycle facilities
59. Works on the construction of facilities for the extraction and processing of uranium
60. Decommissioning of nuclear facilities
61. Installation and commissioning works at nuclear facilities
62. Works on the implementation of construction control of objects using atomic energy
63. Works on organizing the construction of nuclear facilities

Testing cost:

Certificate of accreditation of the National Association of Builders dated 25.09.2013. No. 378 of the Non-state educational institution of additional professional education "Center for the Quality of Construction" as a testing center in the Unified Certification System for Managers and Specialists of the Construction Complex.

*no more than 3 tests.

Certification of designers

Certification of managers and specialists of the project complex is a prerequisite for obtaining permits for the execution of work on the preparation of project documentation that affects the safety of capital construction projects.

3. a copy of the document confirming the completion of advanced training, retraining for the relevant type (types) of work;

4. a copy of a document confirming the availability of the relevant specialized higher or secondary vocational education.

Name of types of work

1. Work on the preparation of a planning organization scheme land plot

1.1. Preparation work master plan land plot

1.2. Works on the preparation of a planning organization scheme for the route of a linear facility

1.3. Works on the preparation of the scheme of the planning organization of the right of way linear structure

2. Work on the preparation of architectural solutions

3. Work on the preparation of constructive solutions

4. Work on the preparation of information on internal engineering equipment, internal networks of engineering and technical support, on the list of engineering and technical measures

4.1. Works on the preparation of projects for internal engineering systems of heating, ventilation, air conditioning, smoke ventilation, heat supply and refrigeration

4.2. Works on the preparation of projects for internal engineering systems of water supply and sewerage

4.3. Works on the preparation of projects for internal power supply systems

4.4. Works on the preparation of projects for internal low-voltage systems

4.5. Works on the preparation of projects for internal dispatching, automation and management of engineering systems

4.6. Works on the preparation of projects for internal gas supply systems

5. Work on the preparation of information on external networks of engineering and technical support, on the list of engineering and technical measures

5.1. Works on the preparation of projects for external heat supply networks and their structures

5.2. Works on the preparation of projects for external water supply and sewerage networks and their structures

5.3. Works on the preparation of projects for external power supply networks up to 35 kV inclusive and their structures

5.4. Works on the preparation of projects for external power supply networks of not more than 110 kV inclusive and their structures

5.5. Works on the preparation of projects for external power supply networks of 110 kV and more and their structures

5.6. Works on the preparation of projects for external networks of low-voltage systems

5.7. Works on the preparation of projects for external gas supply networks and their structures

6. Preparation work technological solutions

6.1. Works on the preparation of technological solutions for residential buildings and their complexes

6.2. Works on the preparation of technological solutions for public buildings and structures and their complexes

6.3. Works on the preparation of technological solutions for industrial buildings and structures and their complexes

6.4. Works on the preparation of technological solutions for transport facilities and their complexes

6.5. Works on the preparation of technological solutions for hydraulic structures and their complexes

6.6. Works on the preparation of technological solutions for agricultural facilities and their complexes

6.7. Works on preparation of technological solutions for facilities special purpose and their complexes

6.8. Works on the preparation of technological solutions for oil and gas facilities and their complexes

6.9. Works on the preparation of technological solutions for objects of collection, processing, storage, processing and disposal of waste and their complexes

6.10. Works on preparation of technological solutions for facilities nuclear energy and industry and their complexes

6.11. Work on the preparation of technological solutions for military infrastructure facilities and their complexes

6.12. Works on the preparation of technological solutions for treatment facilities and their complexes

6.13. Works on the preparation of technological solutions for metro facilities and their complexes

7. Work on the development of special sections project documentation

7.1. Engineering and technical measures for civil defense

7.2. Engineering and technical measures for the prevention emergencies natural and man-made nature

7.3. Development of a declaration on industrial safety hazardous production facilities

7.4. Development of a declaration of safety of hydraulic structures

7.5. Development of justification for radiation and nuclear protection

8. Works on the preparation of projects for the organization of construction, demolition and dismantling of buildings and structures, extension of the service life and conservation

9. Work on the preparation of projects for protection measures environment

10. Works on the preparation of draft measures to ensure fire safety

11. Work on the preparation of draft measures to ensure access for people with limited mobility

12. Work on the inspection of building structures of buildings and structures

13. Works on organizing the preparation of project documentation by the involved developer or customer on the basis of a contract legal entity or an individual entrepreneur (general designer)

Testing cost:

1 day of testing for 1 person 1000 rubles.*

*no more than 3 tests.

Prospector Certification

Certification of managers and specialists of the survey complex is a prerequisite for obtaining permits to perform engineering survey work that affects the safety of capital construction projects.

Certification is carried out in accordance with Order of the Ministry of Regional Development of Russia dated December 30, 2009 No. 624"On approval of the List of types of work on engineering surveys, on the preparation of project documentation, on the construction, reconstruction, overhaul of capital construction facilities that affect the safety of capital construction facilities."

To pass certification, you must submit the following documents:

1. written application for certification;

2. a copy of the passport (with a residence permit);

3. a copy of the document confirming the completion of advanced training, retraining for the relevant type (types) of work;

4. a copy of a document confirming the availability of the relevant specialized higher or secondary vocational education.

Name of types of work

1. Works as part of engineering and geodetic surveys

1.1. Creation of reference geodetic networks

1.2. Geodetic observations of deformations and settlements of buildings and structures, movements of the earth's surface and dangerous natural processes

1.3. Creation and updating of engineering and topographic plans on a scale of 1:200-1:5000, including in digital form, survey of underground utilities and structures

1.4. Line feature tracing

1.5. Engineering and hydrographic works

1.6. Special geodetic and topographic works during the construction and reconstruction of buildings and structures

2. Works as part of engineering and geological surveys

2.1. Engineering-geological survey on a scale of 1:500-1:25000

2.2. Sinking of mine workings with their testing, laboratory studies of the physical and mechanical properties of soils and chemical properties groundwater samples

2.3. The study of dangerous geological and engineering-geological processes with the development of recommendations for the engineering protection of the territory

2.4. Hydrogeological research

2.5. Geophysical surveys

2.6. Engineering geocryological research

2.7. Seismological and seismotectonic studies of the territory, seismic microzoning

3. Works as part of engineering and hydrometeorological surveys

3.1. Meteorological observations and study of the hydrological regime of water bodies

3.2. Study of dangerous hydrometeorological processes and phenomena with calculations of their characteristics

3.3. Study of channel processes of water bodies, deformations and processing of banks

3.4. Studies of the ice regime of water bodies

4. Works as part of engineering and environmental surveys

4.1. Engineering and environmental survey of the territory

4.2. Studies of chemical pollution of soils, surface and ground waters, atmospheric air, sources of pollution

4.3. Laboratory chemical-analytical and gas-chemical studies of samples and samples of soil and water

4.4. Research and assessment of physical impacts and radiation situation on the territory

4.5. Study of vegetation, wildlife, sanitary-epidemiological and medical-biological studies of the territory

5. Works as part of engineering and geotechnical surveys

5.1. Sinking of mine workings with their testing and laboratory studies of the mechanical properties of soils with the determination of characteristics for specific schemes for calculating the bases of foundations

5.2. Field tests of soils with the determination of their standard strength and deformation characteristics (stamp, shear, pressuremeter, shear). Tests of reference and full-scale piles

5.3. Determination of standard mechanical characteristics of soils by methods of static, dynamic and drilling sounding

5.4. Physical and mathematical modeling interaction of buildings and structures with the geological environment

5.5. Special studies of soil characteristics according to individual programs for non-standard, including non-linear methods for calculating the bases of foundations and structures of buildings and structures

5.6. Geotechnical control of construction of buildings, structures and adjacent territories

6. Inspection of the state of soils of the foundation of buildings and structures

Testing cost:

1 day of testing for 1 person 1000 rubles.*

*no more than 3 tests.

Certification NOSTROY today is one of the documents in demand, which, in addition to advanced training, is necessary to obtain a permit from the SRO for construction work.

Construction companies are increasingly faced with the need to pass certification. NOSTROY is, in a way, a test of the knowledge of specialists and company management.

At the same time, certification National association builders, which is why it got its name. In general, such a check is designed to improve the quality of services provided by construction companies, which, in turn, makes it possible to exclude unscrupulous developers and incompetent specialists from entering the market.

First, the specialists of the company undergoing verification must undergo advanced training. Only after that they will be admitted to computer testing. NOSTROY certification is carried out in accredited institutes and training centers.

In the future, after passing the test, he draws up an act of assessing the level of knowledge. The certification results are published in the Unified Register and are available to SROs.

The relevant self-regulatory organization also receives an Assessment Report, on the basis of which the question is already being decided whether the company can be attested.

How to get NOSTROY certification on your own?

To do this, you need to contact a specialist in the computer access center. It is worth saying that certification is possible at the SROs themselves or at the centers for improving certification. At the same time, those who wish to receive a document are free to choose where they will be tested.

In centers where testing is possible, the program is linked to the NOSTROY website. This means that the results of the check are sent to the official website in real time, without delay and substitution of results.

  • On average, each test contains about forty questions.
  • The questions relate to different areas of construction and types of work.
  • 60 minutes were given for answers.
  • There is a certain error limit, which you must not exceed if you want to pass the certification with success.
  • If the testing is successful, then the data on this will be entered into the NOSTROY Register, and the employee will subsequently receive an Attestation Certificate.
  • In the SRO where the company is a member, employees who have passed certification must receive an appropriate document about this.

You can try to pass the test yourself and get a Certificate. But there is also an opportunity to avoid the difficulties associated with verification if you contact a specialized company that has experience in providing this kind of service.

Certification plus is a specialized center for obtaining permits. With its help, Certification in Moscow takes place in the shortest possible time without any problems.

As for passing NOSTROY certification, such a service is available to the company's clients from any region of our country.

Certification NOSTROY with Certification Plus

The Certification Plus group of companies includes the accredited center NOSTROY. This means that you can be verified from any region.

To find out the cost of going through the procedure, and to determine what the terms for attestation and receipt of Inspection Certificates will be, you can fill out a special online form on the company's website, where you indicate:

  • type of SRO;
  • the number of employees who need certification;
  • contact number and email address.

After that, an employee of the center can evaluate the amount of work and set realistic deadlines when NOSTROY certification can be carried out for all employees. At the same time, the Certification Plus specialist guarantees the confidentiality of the data of clients who have applied for help.

You can also count on detailed professional advice regarding the process of obtaining a NOSTROY certificate. To do this, you will need to contact a specialist to ask him questions that interest you. You can do this through the following contacts:

Employees of the company are always ready to answer any questions related to obtaining certificates and attestation.

NOSTROY certification results are recognized by all self-regulatory organizations, which are participants in the unified certification system NOSTROY. The inspection itself is carried out every 5 years.

To work according to the law, have additional features and advantages over other construction companies, NOSTROY certification by employees should be mandatory and not questioned in its necessity.

Due to changes in the certification procedure, the service is temporarily not available.


Such certification should be carried out only with the personal presence of the employee in a training center accredited by NOSTROY.

Each type of work corresponds to one test that must be passed. As a rule, if an organization receives permission for a large list of works, then some SROs require certification for almost all types of work.

The list of tests for certification according to the NOSTROY system:

  1. Civil works
  • 001.01. Preparatory work
  • 001.02. Excavation
  • 001.03. Well construction
  • 001.04. Pile work
  • 001.05. Artificial fixation of soils
  • 001.06. Installation and arrangement of concrete, reinforced concrete, prefabricated concrete, prefabricated reinforced concrete, and monolithic structures
  • 001.07. Works on the device of stone structures
  • 001.08. Installation of metal structures
  • 001.09. Installation of wooden structures
  • 001.10. Protection of building structures
  • 001.11. Roofing
  • 001.12. Facade works
  • 001.13. Geodetic works
  1. Installation and commissioning of lifting and transport equipment
  • 002.1. Installation and commissioning of lifting and transport equipment in the direction of "Elevators"
  • 002.2. Installation and commissioning of other handling equipment
  1. Installation of equipment for power plants, hydraulic structures
  2. Installation and commissioning in the field of heat and gas supply of ventilation, air conditioning, refrigeration units
  • 004.1. Installation and commissioning works in the field of heat and gas supply
  • 004.2. Installation and commissioning in the field of air conditioning and refrigeration
  1. Installation and commissioning in the field of fire safety, power supply, telemechanics and automation
  2. Installation and commissioning works at the facilities of the oil and gas and chemical complex
  3. Installation of equipment at metallurgy enterprises
  4. Installation of underground construction equipment
  5. Installation of railway transport equipment
  6. Installation of equipment and commissioning of water supply and sewerage facilities
  7. Commissioning works electrical equipment
  8. Commissioning of machine lines and metal-cutting machines
  9. Installation of water supply and sewerage networks
  10. Arrangement of heat supply systems for buildings and structures
  11. Arrangement of gas supply systems for buildings and structures
  12. The device of power supply networks
  • 020.1. Arrangement of internal power supply networks
  • 020.2. Arrangement of external power supply networks with voltage up to 1 kV inclusive
  • 020.3. Arrangement of external power supply networks with voltage up to 330 kV inclusive
  • 020.4. Arrangement of external power supply networks with a voltage of more than 330 kV
  • 020.5. Railway electrification
  1. Installation and dismantling of supports for overhead lines
  • 021.1. Installation and dismantling of supports for overhead power lines and voltage up to 35 kV
  • 021.2. Installation and dismantling of supports for overhead power lines and voltage up to 500 kV
  • 021.3. Installation and dismantling of supports for overhead power lines and voltages over 500 kV
  1. Installation and dismantling of wires and lightning protection cables of overhead power lines and transformer substations
  • 022.1. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage up to 35 kV
  • 022.2. Installation and dismantling of wires and lightning protection cables of overhead power lines with voltage over 35 kV
  • 022.3. Installation and dismantling of transformer substations and linear electrical equipment with voltage up to 35 kV inclusive
  • 022.4. Installation and dismantling of transformer substations and linear electrical equipment with voltage over 35 kV
  1. underground construction
  • 023.1. Construction of tunnels, subways
  • 023.2. Construction of mine structures
  1. Transport construction
  • 024.1. Construction of roads and airfields
  • 024.2. Arrangement of railway and tram tracks
  • 024.3. Construction of bridges, flyovers and overpasses
  1. Hydraulic works
  2. Diving work
  3. Industrial furnaces and chimneys
  4. Drilling and blasting
  5. Special works for the protection of building structures and equipment
  6. Arrangement of external communication lines, including telephone, radio and television
  7. Installation of equipment for communication facilities
  8. Construction control over civil works
  9. Construction control over works on the arrangement of oil and gas wells
  10. Construction control over drilling and blasting
  11. Construction control over works in the field of water supply and sewerage
  12. Construction control over works in the field of heat and gas supply and ventilation
  13. Construction control over works in the field of power supply
  14. Construction control during construction, reconstruction and overhaul of communication facilities
  15. Construction control during construction, reconstruction and overhaul of oil and gas industry facilities
  16. Construction control during the construction, reconstruction and overhaul of roads and airfields, bridges, flyovers and overpasses
  17. Construction control during the construction of railway and tram tracks
  18. Construction control during construction, reconstruction, overhaul in underground conditions
  19. Construction control over hydrotechnical and diving works
  20. Construction control during the construction, reconstruction and overhaul of industrial furnaces and chimneys
  21. Construction organization works
  • 046.1. Works on the organization of construction (head, deputy head of the organization)
  • 046.2. Work on the organization of construction (Head of VET, Deputy Head of VET)
  • 046.3. Works on the organization of construction (line worker)
  1. Drilling, construction and installation of oil and gas wells
  2. Arrangement of main and field pipelines
  3. Quality control of welded joints and their insulation

AVERGROUP LLC is a partner of educational institutions accredited as testing centers NOSTROY. We will arrange remote certification for your employees.

The cost of issuing NOSTROY certificates:

  • Number of tests 1-4 - 4500/1 test;
  • Number of tests 5-10 - 4000/1 test;
  • Number of tests 11-30 - 3500/1 test;

To issue certificates NOSTROY must be sent to our email address [email protected] the following data:

  1. Company card for concluding an agreement;
  2. List of tests that you need to pass;
  3. Contact details (full name, phone number, e-mail address).

April 2011 Nostroy approved the Regulations on the Unified Certification System (ESA) for managers and specialists of various profiles in the construction industry. 230 types of works from the Order of the Ministry of Regional Development No. 624 were identified as the basis for computer testing. 14,000 tests in the form of a question-answer and criteria for assessing the level of knowledge of certification participants were developed. More than three hundred Test Acceptance Centers are accredited. NOSTROY certification is carried out for managers and specialists of engineering and technical technical workers organizing production process at the enterprise).

Certification by Nostroy for managers and specialists of the construction complex is carried out according to the established unified certification system, according to the approved form of NOSTROY through accredited educational institutions.

The qualification certificate is issued for a period of 5 years. Certification by Nostroy of specialists is carried out only after they have completed advanced training courses (72 hours, 104 hours) in their field of work. After successful testing, the specialist receives qualification certificate with an application in the SRO, in which he is a member. Qualification certificates obtained during the passage unified system certifications are recognized by all SROs - participants of the Unified Certification System (NOSTROY). The testing acceptance center can be an organization that checks the knowledge levels of certification participants - employees of construction complex organizations, as well as individual entrepreneurs that have received Nostroy accreditation. Based on the Regulations on the ECA, such accredited centers perform a number of the following functions: 1) Accept documents submitted for certification; 2) Decide to allow or refuse admission to the certification, 3) Conduct computer testing and assess the level of knowledge of the participants in the certification, 4) Transfer the results of the verification to the certification commissions of the SRO; 5) Issue information about attestation in the form of extracts contained in the Unified Register, 6) Enter information into the Unified Register of information about attestation; 7) Consider in a preliminary mode complaints based on the results of assessments of knowledge levels and redirect them to the Commission, which considers these complaints on the merits. The existence of accredited testing centers is due to an important factor - the unwillingness of the SROs themselves to conduct certification. This kind of unwillingness is associated with the following facts: 1) Part 1 of Article 14 of the Federal Law “On Self-Regulatory Organizations” - SROs are not entitled to associate their activities with an entrepreneurial basis. Those. Certification by the nostroy of specialists of the SRO can only be free of charge, while the costs associated with the organization of such certification of the SRO should be borne at its own expense. 2) The Regulation on the ECA determines that the testing center does not have the right to refuse to accept attestation from participants of employers who are members of other SROs. Those. SRO, in case of applying to it, will conduct certification of employees of members of other SROs at its own expense. On the basis of paragraph 1.4 of the ECA Regulations, SROs may apply this Regulation on a voluntary basis. Therefore, not all SROs have joined the ECA and apply Nosstroy certification to their members. Employees of organizations or individual entrepreneurs must, through their employer or independently, send the following documents to any of the accredited testing centers: 1) Application for attestation of Nostroy; 2) A document (certificate or certificate) stating that this employee has undergone advanced training (copy); 3) A document (diploma) certifying that a specialist has received any education (higher and / or secondary profile). The information provided about a specialist is sent by the testing center in Nostroy, where they are recorded in the Unified Register of Attestation Information. After passing the test, the center that accepted such testing draws up a Knowledge Level Assessment Act, information from which is stored in the Unified Register and can be publicly available to the relevant SROs. A copy of such an Act is provided to the specialist who has passed certification if requested. By the Center for Acceptance of Testing, this assessment report is submitted to the certification commission specified in the application for certification of the SRO. The Certification Commission, within a period of not more than one month, makes a decision - to issue or refuse to issue a Certificate based on the results of the analysis of the Assessment Report. The Certification Commission has the right to appoint additional conduct benchmark scores levels of knowledge of specialists. Information about the results of the certification (positive or negative) must be reflected in the Unified Register of information about certification. The period of validity of the certificate is established by the certification committee. The term cannot be more than 5 (five) years. ANO DPO "MIPPK" actively cooperates with Accredited Centers Nostroy. Certification of specialists can be organized in any region of the Russian Federation.

In accordance with the requirements of the current legislation of the Russian Federation, all companies and individual entrepreneurs when joining a self-regulatory organization (SRO) and obtaining a permit for construction work, must comply organization's requirements for

  • number of employees
  • their education,
  • vocational training,
  • work experience,
  • professional certification.

That. the company will not be able to obtain admission to work without certification by specialists.

A prerequisite for the activities of the management, specialists of the construction sector is the passage of certification in ESA NOSTROY once every 5 years. NOSTROY standards today include 84 documents, 50 standards are under discussion at the adoption stage. In the absence of a certificate of the Unified Certification System, employees of the construction complex are considered non-compliant with the requirements for SRO participants. The result of refusal of attestation may be the exclusion of SRO participants, the suspension of the right of admission.

April 2011 Nostroy approved the Regulations on the Unified Certification System (ESA) for managers and specialists of various profiles in the construction industry. 230 types of work from the Order of the Ministry of Regional Development of the Russian Federation No. 624 were identified as the basis for computer testing. 14,000 tests in the form of a question-answer and criteria for assessing the level of knowledge of certification participants were developed. More than three hundred Test Acceptance Centers are accredited.

At present, certification is carried out Attestation commissions self-regulatory organizations accredited by the National Association of Builders according to the standards of the Unified Certification System (ESA NOSTROY) and is carried out by accredited testing centers.

"Unified system of certification of managers and specialists of the construction complex"- a unique project of the National Association of Builders (NOSTROY). NOSTROY includes 236 construction self-regulatory organizations, uniting more than 90,000 construction companies total strength more than 4500000 employees. At least 500 thousand employees of construction companies are responsible for the performance of work that affects the safety of capital construction projects. In accordance with the requirements of the Urban Planning Code Russian Federation persons performing such work are required to undergo advanced training and certification at least once every five years. Organization of certification the federal law"On Self-Regulatory Organizations" imposes on self-regulatory organizations.

The main principles of the "Unified Certification System" are:

  • certification is carried out by types of construction works in accordance with their grouping by tests for the purposes of certification;
  • certification is carried out according to uniform requirements and the criteria for making decisions on attestation;
  • assessment of knowledge of certified persons is carried out in the form of computer testing;
  • certificates issued within the framework of the Unified Attestation System are recognized by all self-regulatory organizations - participants in the Unified System;
  • monopolization of attestation is not allowed. An applicant for attestation should be able to choose Testing Centers sufficient to form a competitive environment;
  • certification should be as simple as possible for applicants for certification through the passing procedure. Servicing of applicants for certification should be carried out by Testing Centers. Knowledge assessment sites should cover the territory of the Russian Federation in such a way that their transport accessibility is not a significant burden for applicants for certification;
  • control over the activities of the Testing Centers is provided by self-regulatory organizations and the National Association of Builders. A fictitious assessment of the level of knowledge of applicants for certification should inevitably lead to the cancellation of the accreditation of Testing Centers.

An effective way to obtain an ECA certificate is to undergo pre-certification training and testing in training center"Mosstroykadry". The Mosstroydra training center is accredited National Association of Builders testing center and can conduct pre-certification training and computer testing at ESA NOSTROY. For this we:

  • accept documents for certification;
  • we carry out pre-certification preparation and testing;
  • we provide test results to the relevant certification commissions;
  • issue extracts from unified register information about attestation in accordance with the approved form.

You'll get profitable terms and make employee testing an effective investment if you decide to take certification in ESA NOSTROY at our Learning Center. We offer comprehensive pre-certification training for specialists and optimal conditions to pass certification.

Certificate No. 6 on assignment of the status of a basic resource center