Estimated prices for commissioning.

SYSTEM OF REGULATORY DOCUMENTS IN CONSTRUCTION

ESTIMATE STANDARDS
RUSSIAN FEDERATION

FERp 81-04-02-2001

Approved And introduced in de th action from 16 April l I 2003 G.
resolution Gosstroy Russia from
16 . 04 . 2003 G . 35

FEDERAL
UNIT PRICES
ON START
H A L A D O N T WORKS

FERp-2001

Collection No.2

AUTOMATED SYSTEMS
MANAGEMENT

State Committee of the Russian Federation
for construction and housing
n o-comm al complex
(Gosstroy of Russia)

Moscow2003G.

Federal unit prices for commissioning about private work FERp- 2001-02 Automated control systems.

(Gosstroy of Russia) Moscow, 2003G.

Designed to determine direct costsT in the estimated cost, as well as for settlements for the completed commissioning of automated control systems.

Compilation designed in price level1-th territorial region as of January 1, 2000.

DEVELOPEDFederal State Unitary Enterprise TsNIIEUS Gosstroy of Russia (Zh.G. Cherns shova, L.V. Razmadze), JSC "Association of Monta zhavtomatika "(B .Z . Barlasov, M.I. Logoiko), Coordinating Center for Pricing and Estimated Rationing in Construction LLC (A.N. Zhukov) with the participation of the Interregional Center for Pricing in Construction and Industry building materials(MTsTSS) Gosstroy of Russia (V.P. Shuppo).

CONSIDEREDDepartment of Pricing and Estimated Rationing of the Gosstroy of Russia (Editorial Commission: V.A. Stepanov - Head, V.G.Kozmodemyansk iy, T .L. Gri ischenkova).

INTRODUCEDDepartment of Pricing and Estimated Rationing of the Gosstroy of Russia.

APPROVED AND INTRODUCED from 16 . 04. 200316. 04. 2003 No. 35

FEDERAL UNIT RATES
ON PUSKON
L ADDITIONAL WORKS

Collection 2

Automated control systems

FERp-2001-02

TECHNICAL PART

1. General provisions

1. 1. These federal unit prices (hereinafter referred to as prices) are intended to determine direct costs in the estimated cost of the start-up palmar x works on automated control systems at commissioning under construction, as well as reconstructed, expanded and technically re-equipped operating enterprises, buildings and structures.

1. 2. Prices reflect the industry average level of technology and organization of commissioning th works.

The rates are obligatory for application by all enterprises and organizations, regardless of their departmental affiliation and forms of ownership, carrying out capital construction at the expense of the state budget of all levels and target off-budget funds.

For construction projects financed at the expense of own funds of enterprises, organizations and individuals, the prices of this collection are advisory in nature.

1. 3. Rates are based on:

Collection of state elemental estimated norms for start-up l and daughters e work - GESNp-2001-02 "Automated control systems", approved and put into effect from July 15, 2001 by a resolution of the Gosstroy of Russia dated July 23, 2001 No. 84;

start-up pay levell recruiting personnel hired on the basis of the state statistical reporting in construction in the first territorial region as of January 1, 2000.

1. 4. When applying this collection, in addition to the provisions contained in this technical part, it is necessary to take into account the general requirements given in the Guidelines for the use of federal unit prices for commissioning, approved and put into effect by the Gosstroy of Russia.

1. 5. This Collection applies to:

Automated process control systems (APCS);

Centralized operational dispatch control systems;

Automatic fire and security fire alarm systems;

Control systems and automatic control fire fighting and countersmoke protection;

telemechanical systems.

The collection is not intended to determine direct costs in the estimated cost of work:

For precision in-line analyzers of the physicochemical properties of media and products circulating in the technological process: refractometers, chromatographs, octane meters and other similar single-use analyzers;

For software and hardware complexes of computer centers for economic or other information not related to technological processes;

For video surveillance (security) systems using television installations, loud-speaking communications (alerts), etc., the direct costs of which are determined according to the Collection for the installation of equipment No. 10 "Communication equipment".

(Changed edition. Rev. No. 1)

1. 6. Rates are based on the following conditions:

Software and hardware complexes (KPTS) orto complexes of technical means ( TO TS) transferred for adjustment - serial, completed, with a loaded system and application software, secured technical documentation(passports, certificates, etc.), the period of their storage in the warehouse does not exceed the standard;

Commissioning works are carried out by organizations licensed to carry out these types of work, when performing work at facilities supervised by authorities state supervision additionally licensed and/or approved by these agencies. Employees performing work have qualifications corresponding to the technical complexity of automated systems, have passed the necessary training, attestation or certification, are provided with the necessary equipment, measuring instruments, control and test benches, instrumental software, programmers, calibrators, tools, personal protective equipment, etc. .;

Puscona l hello The work is carried out on the basis of the working documentation approved by the customer, if necessary, taking into account the project for the production of works (P P P), programs and graphics;

By the start of the start-up worksd the customer transferred the working design documentation to the internal organization, including parts of the APCS project: mathematical software (MS), information software (IS), software (SW), organizational software (OO);

To start-up production l adjective x works are started if the customer has documents on the completion of the installation work provided for by SNi P (acts, protocols, etc.). In the event of forced breaks between installation and adjustment work for reasons beyond the control of the contractor, to start-up palmar m work is started after checking the safety of previously assembled and installation of previously dismantled technical means (in this case, the act of completion of installation work is drawn up anew on the date of commencement of commissioning);

Switching operating modes technological equipment are made by the customer in accordance with the project, regulations and within the periods provided for by the agreed programs and work schedules;

Detected defects in the installation of software and hardware (PTS) or hardware (TS) are eliminated by the installation organization.

(Changed edition. Rev. No. 1)

1. 7. Prices are developed in accordance with the requirements state standards, in particular, GOST 34. 603- 92 « Information technology. Types of testing of automated systems", standards " State system industrial devices and means of automation”, “State system for ensuring the uniformity of measurements”, 3-th part of SNiP "Organization, production and acceptance of work", Rules for the installation of electrical installations (PUE), Intersectoral rules for labor protection (safety rules) during the operation of electrical installations (POTRM- 016-2001) RD 153-34.0-03.150-00,"Safety Rules for Gas Distribution and Gas Consumption Systems" (PB-12-529-03. O general rules s safe for adults fire hazard x chemical, petrochemical and oil refining industries (PB 09-540-03) and other rules and norms of state supervision bodies, technical documentation of manufacturers of the TCP or TS, duly approved instructions, technical and technological regulations, guiding technical materials and other technical documentation for the installation, commissioning and operation of the TCP and TS.

(Changed edition. Rev. No. 1)

1. 8. The prices take into account the costs for the production of a set of works of one technological cycle of commissioning for the commissioning of the process control system in accordance with the requirements of regulatory and technical documentation, including the following stages (stages):

1. 8.1.Preparatory work, verification of KTS (KTS) of automated systems:

Study of working and technical documentation, incl. materials of the pre-project stage (technical requirements for the system, etc.), the implementation of other measures of engineering and technical preparation of work, inspection of the technological control object, external inspection of the equipment and installation work performed on the APCS, determination of the readiness of systems adjacent to the APCS (power supply, etc.). etc.), etc.

Verification of the compliance of the main technical characteristics of the equipment with the requirements established in the passports and instructions of manufacturers (the results of verification and adjustment are recorded in the act or passport of the equipment, faulty TCP or TS are transferred to the customer for repair and replacement).

(Changed edition. Rev. No. 1)

1. 8. 2. Autonomous adjustment of automated systems after completion of their installation:

Checking the installation of the PTS (TS) for compliance with the requirements of the instructions of manufacturers and working documentation;

Replacement of individual defective elements with serviceable ones issued by the customer;

Checking the correct marking, connection and phasing of electrical wiring;

Phasing and control of the characteristics of actuators (IM);

Setting up the logical and temporal relationships of signaling, protection, blocking and control systems, checking the correctness of the passage of signals;

Checking the functioning of application and system software;

Preliminary determination of the characteristics of the object, calculation and adjustment of the parameters of the equipment of automated systems, configuration of measuring transducers and software logic devices;

Preparation for inclusion and inclusion in the operation of measurement, control and management systems to ensure individual testing of process equipment and adjustment of the settings for the equipment of control systems in the process of their operation;

Preparation of production and technical documentation.

(Changed edition. Rev. No. 1)

1. 8. 3. Complex adjustment of automated systems:

Bringing the settingsP TS (TS), communication channels and application software to the values ​​(state) at which automated systems can be used in operation, while carried out in a complex:

Determining the compliance of the procedure for testing devices and elements of signaling, protection and control systems with the algorithms of working documentation, identifying the causes of failure or their “false” operation, setting the necessary values ​​for the operation of positional devices;

Definition of conformity bandwidth lock-regulatorcomfort her fittings requirements technological process, correct working out of limit and travel switches,position and status sensors;

Determination of the flow characteristics of regulatory bodies (RO) and bringing them to the required rate using the adjustment elements available in the design;

Clarification of the static and dynamic characteristics of the object, adjusting the values ​​of the system settings, taking into account their mutual influence in the process of work;

Preparation for the inclusion in the operation of systems to ensure the comprehensive testing of technological equipment;

Testing and determining the suitability of automated systems to ensure the operation of process equipment with a capacity that meets the standards for the development of design capacities in the initial period;

Analysis of the work of automated systems;

Registration of production documentation, act of acceptance into operation of systems in accordance with the requirements of SNiP;

Making changes in one copy of the circuit diagrams from the set of working documentation, agreed with the customer, based on the results of the start-up production d eye work.

1.9. The prices of this Collection do not include the costs of:

Puscona l and daughters e works, prices for which are given in the relevant sections EPp-2001-01 "Electrical devices": on electric machines (motors) of electric drives, switching devices, static converters, power devices, measurements and tests in electrical installations;

Testing of automated systems over24hours of their work during the period of complex testing of technological equipment;

Drawing up a technical report and estimate documentation;

Delivery of measuring instruments to state verification;

Configuring components and screen forms, adjusting and finalizing the design mathematical, information and software, determined on the basis of standards for design work;

Audit of PTS (TS), elimination of their defects (repair) and installation defects, including bringing the insulation of electrical equipment, cable communication lines and parameters of installed fiber-optic and other communication lines to the standards;

Checking the compliance of wiring diagrams with circuit diagrams and making changes to wiring diagrams;

Preparation of principal, assembly, detailed diagrams and drawings;

Partial or complete reassembly of cabinets, panels, consoles;

Coordination of work performed with supervisory authorities;

Carrying out physical and technical and chemical analyzes, supply of exemplary mixtures, etc.;

Drawing up a program of complex testing of technological equipment;

Training of operating personnel;

Development of operational documentation;

Technical (service) maintenance and periodic checks of the KTS (KTS) during the operation period.

(Changed edition. Rev. No. 1)

1.10. The prices of this Collection are developed for automated systems (hereinafter referred to as systems) depending on the category of their technical complexity, characterized by the structure and composition of the KTS (KTS),taking into account the complexity factor.

Table 1

Characteristics of the system (structure and composition of the KTS or KTS)

System complexity factor

Single-level information, control, information and control systems, characterized in that measuring and regulating devices are used as components of the CTS to perform the functions of collecting, processing, displaying and storing information and generating control commands. at communication devices, electromagnetic, semiconductor and other components, signal fittings, etc. instrumental or hardware types of execution

Single-level information, control, information - control systems, characterized in that programmable logic controllers are used as components of the KPTS to perform the functions of collecting, processing, displaying and storing information and generating control commands ( PLC ), intercom devices, microprocessor-based operator interfaces (display panels)

1, 313

Single-level systems with automatic mode of indirect or direct (direct) digital (digital-analog) control using object-oriented controllers with programming of settings parameters, the operation of which does not require the development of project MO and software

Information, control, information and control systems in which the composition and structure of the CTS meet the requirements established for classifying systems as I category of complexity and in which fiber optics are used as communication channels to ne information transmission systems (VOTSI)

Measurement and (or) automatic control systems chemical composition and physical properties of matter

Measuring systems (measuring channels) for which metrological certification (calibration) is required according to the project

Multilevel distributed information, control, information and control systems, in which the composition and structure of the local level CPTS meet the requirements established for classifying the system as a II -th category of complexity and in which processes are used to organize subsequent levels of management s (PCS ) or operator ( OS ) stations; implemented on the basis of problem-oriented software, interconnected and with the local control level through local area networks

1, 566

Information, control, information and control systems in which the composition and structure of the CPTS (CTS) meets the requirements established for classifying systems as II categories of complexity and in which fiber-optic information transmission systems (FOTS) are used as communication channels

Notes : 1 . Systems II and III categories of technical complexity may have one or more features,given as a characteristic of the system.

2. In the event that a complex system contains systems (subsystems), according to the structure and composition of the CPTS or CTS related to different categories of technical complexity, the complexity factor of such a system is calculated in accordance with clause .

1.11.Rates designed for systems I, II and III category of technical complexity depending on the number of communication channels for the formation of input and output signals.

Under the communication channel for the formation of input and output signals (hereinafter - the channel) should be understood as a set of technical means and communication lines that provide the transformation, processing and transmission of information for use in the system.

The Collection takes into account the quantity:

Information channels (including channels for measurement, control, notifications x, address, state, etc.);

control channels.

The composition of information channels and control channels, in turn, takes into account the number of channels:

Discrete - contact and non-contact on AC and DC, pulsed from discrete (signaling) measuring transducers, for monitoring the status of various on-offs x devices, as well as for transmitting “on-off” signals, etc.;

Analog, which include (for the purposes of this Collection) all the rest - current, voltage, frequency, mutual inductance, natural or unified signals of measuring transducers (sensors) that change continuously, encoded (pulse or digital) signals for the exchange of information between different digital devices information processing, etc.

In the following, the symbols for the number of channels given in Table 1 are used. .

table 2

Symbol

Name

K a i

Number of information analogue channels

K d and

Number of information discrete channels

K a y

Number of analog control channels

K d y

Number of discrete control channels

To common and

The total number of information analog and discrete channels

To common

Total number of analog and discrete control channels

K total \u003d (K total and + K total y)

Total number of information and control channels analog and discrete

2. The procedure for applying unit prices

2.1.The collection price tables show base prices ( R b) for commissioning s e works for systems I, II and III category of technical complexity ( R Ib, R IIb, R IIIb), depending on the total number of information and control channels, analog and discrete(K total) in this system.

(Changed edition. Rev. No. 1)

2. 2. For a complex system consisting of subsystems of different categories of technical complexity, the components of the price - the amount of funds for wages (ZP) and the labor cost (H) - is calculated as follows:

at 1< С < 1,313 , where C is the coefficient of complexity, calculated by the formula:

where: - the total number of analog and discrete information and control channels related to subsystems, respectively, I, II, III difficulty categories;

(1.1)

where is the base wage according to Table. 02-01-001 for the system I category of technical complexity (С=1);

The basic rate of labor costs according to table. 02-01-001.

at 1.313< С < 1,566

(2.1)

where is the base wage according to Table. 02-01-002 for the system II category of technical complexity (C=1.313).

where - the basic rate of labor according to table. 02-01-002.

(Changed edition. Change No. 1 )

2. 3. When compiling cost estimates (estimates) for start-up palmar e work to take into account the characteristics of a particular system to the base price ( R b) the following coefficients should be applied:

2. 3. 1 . Coefficient f m i, taking into account two factors: "metrological complexity" and "development» information functions" of the system

Coefficient f m icalculated by the formula:

f m i = 0 , 5 + K a i : K total × M × I, (3)

where M - the coefficient of "metrological complexity", determined by the table. ;

AND - the coefficient of "development of information functions", determined by the table. .

table 3

No. p.p.

Characteristics of the factors of "metrological complexity" ( M) systems

The coefficient of "metrological complexity" of the system ( M)

Measuring transducers (sensors) and measuring instruments etc., operating in normal environmental and technological environment, accuracy class:

less than or equal to 1 , 0

K a uM1

1

below 0 , 2 and above 1, 0

K a uM2

1, 14

greater than or equal to 0 , 2

K a uM3

1, 51

Note : If the system has transducers (sensors) and measuring devices related to different classes accuracy, coefficient M calculated by the formula:

M = (1 +0.14×K a uM2: K a i) × (1 +0.51×K a uM3: K a i),(4)

where:

K a i = K a uM1 + K a uM2 + K a uM3 ;(4. 1)

table 4

no.

Characteristics of the factors of "development of information functions" ( AND) systems

Designation of the number of channels

Coefficient of "development of information functions" of the system ( AND)

1

Parallel or centralized control and measurement of the parameters of the state of the technological control object (TOU)

K total iI1

1

The same as for p . ,including archiving, documenting data, compiling emergency and production (shift, daily, etc.) reports, presenting parameter trends, indirect measurement (calculation) of individual complex indicators of the functioning of TOU

K total uI2

1, 51

Analysis and generalized assessment of the state of the process as a whole according to its model (recognition of the situation, diagnostics of emergency conditions, search for a bottleneck, forecast of the process)

K total iI3

2, 03

Note : If the system has different characteristics of "development of information functions", the coefficient AND calculated by the formula:

And = (1+0.51× K total uI2: TOcommon) × ( 1+1.03 × K total iI3: TOcommon) ,(5)

where:

To common and = K bosch uI1 + K total uI2 + K total uI3; (5.1 )

(Changed edition. Rev. No. 1)

2. 3. 2. Coefficient Ugh, taking into account the "development of control functions", calculated by the formula:

Ugh= 1+ (1, 31 × K and at+ 0.95 × K y ) : K total × At,(6)

where: At- the coefficient of "development of control functions", is determined by the table.

table 5

no.

Characterization of the factors of "development of control functions" ( At) systems

Designation of the number of channels

Coefficient of "development of control functions" of the system(At)

Single-circuit automatic control (AP) or automatic single-cycle logic control(switching, blocking, etc.).

K total yU1

1

Cascade and (or) software AP or automatic software logic control (AP LU) according to a "hard" cycle, multiply connected AR or APLU according to a cycle with branches.

K total yU2

1, 61

Management b fast leakage their processes in emergency conditions or control with adaptation (self-learning and changing the algorithms and parameters of systems) or optimal control (OC) of steady-state modes (in statics), OC of transients or the process as a whole (optimization in dynamics).

K total uU3

2, 39

Note : If the system has different characteristicsR development of control functions”, coefficient At calculated by the formula:

Y = (1+0.61× K total yU2: To common) × (1+1.39× K total uU3: To common); (7)

where:

To common = K bosch yU1 + K total yU2 + K total yU3; (7.1)

2. 4. Estimated price ( R) for a specific system is calculated by applying to the base price established in accordance with paragraph .,coefficients f m i , Ugh, which are multiplied with each other I:

R = R b ×(F m and × F y).(8)

2. 5. When performing start-up la doch s x works in more difficult production conditions, in comparison with those provided for in the collection, as a result of which labor productivity decreases, the coefficients given in the Guidelines for the Application of Federal Unit Prices for Start-Up should be applied to the prices palm work.

2. 6. When performing repeated commissioning works (before putting the object into operation), it is necessary to apply the coefficient to the prices 0, 537. Re-commissioning should be understood as work caused by the need to change the technological process, the mode of operation of technological equipment, in connection with a partial change in the design or forced replacement of equipment. The need to re-perform work must be confirmed by a reasonable task (letter) from the customer.

2. 7. In the event that the automated process control system is created as part of an automated technological complex (ATC) included in the pilot or experimental construction plan, or in the list of unique or especially important (most important) objects (constructions), or the automated process control system includes experimental or experimental software and hardware (technical) means, a coefficient is applied to the prices 1, 2.

2. 8. In the event that the launch palmar If the work is carried out under the technical supervision of the personnel of the manufacturer or supplier of the equipment, the coefficient should be applied to the prices 0, 8.

2. 9. Specified in paragraphs. ÷ the coefficients are applied to the cost of those stages of work (the corresponding number of information and control channels), which are subject to the above conditions. If multiple coefficients are used, they must be multiplied.

2. 10. Reducing factor for the same type of automated technological complexes (ATK) in accordance with clause 2.5. MDS 81-40.2006 is taken into account by the norms of this Collection, subject to a special calculation procedure, in which the price is initially determined as a whole for several of the same type of ATK in accordance with the project and, if necessary, a price is allocated for one of the same type of ATK.

It is not allowed, when determining estimated prices, artificial, contrary to the project, division of the automated system into separate measurement systems, control (regulation) loops, subsystems.

For example: For a centralized system of operational dispatch control of ventilation and air conditioning, including several subsystems of supply and exhaust ventilation, the estimated price is determined as a whole for the centralized control system, and the costs for individual subsystems, if necessary, are determined as part of the overall price for the whole system , taking into account the number of channels related to subsystems.

(Changed edition. Rev. No. 1)

2. 11. If it is necessary to make interim settlements for the performed commissioning works, it is recommended to use the approximate structure of the cost of commissioning works by their main stages (unless the contract provides for other conditions for mutual settlements of the parties), given in Table. .

table 6

no.

Name of the stages of commissioning

Share in the total cost of work, %

Preparatory work, verification of TCP (PS):

25

including preparatory work

10

Offline system tuning

55

Complex adjustment of systems

20

Total

100

Notes :

2. In the event that the customer engages one organization to perform commissioning work on software and hardware (for example, a project developer or equipment manufacturer that has the appropriate licenses for commissioning palmar x works), and for technical means - another start-up daughter organization, distribution of the volume of work performed by them (within the total cost of work on the system), including the stages of Table. , is produced, in agreement with the customer, taking into account about the total number of channels related to PTS and TS.

(Changed edition. Rev. No. 1)

3. The procedure for preparing initial data for budgeting

3.1.Preparation of initial data for budgeting is carried out on the basis of design and technical documentation for a specific system.

When preparing the initial data, it is recommended to use the "Scheme of an automated technological complex (ATC)» given in the appendix .

Preparation of initial data is carried out in the following sequence:

3.1.1.As part of the ATK, according to the scheme, the following groups of channels are distinguished according to Table. .

table 7

no.

Channel group symbol

Channel group content

1

CBTFROMTOU(KTS)

Control channels analog and discrete (K but at and K d )transfer of control actions from K P TS (KTS) at TOU . The number of control channels is determined in count actuators: membrane, piston, electric single- and multi-turn, non-engine (cut-off), etc.

2

TOUKPTS (KTS)

but And and K d and )transformation of information (parameters) coming from the technological control object (TOU) to the KPTS (KTS) . The number of channels is determined quantity measuring transducers, contact and non-contact signaling devices, equipment position and condition sensors, limit and limit switches, etc. wherein combined fire protection sensorn noah signaling ( pic) is taken into account as one discrete channel

3

Op→K PTS (KTS)

Analogue and discrete information channels (K but And and K d and )used by the operator (Op) to influence the KTS (KTS) .

The number of channels is determined the number of organs of influence, used by the operator ( buttons, keys, controls etc.) to implement the functioning of the system in the modes of automated (automatic) and manual remote control of actuators not counted as organ channels impact KPTS (KTS) used for tuning and other auxiliary functions (except for control): keyboard of terminal devices of information and control panels, buttons, switches, etc., panels of multifunctional or multi-channel devices of POS control panels, etc., as well as voltage switches, fuses and other auxiliary bodies for influencing the above and other technical meansthe adjustment of which is taken into account by the prices and norms of this Collection

4

KPTS→About n(KTS)

Channels analog and discrete (TO a and and K d i) displaying information coming from KTS (KTS) to Op when determining the number of system channels not taken into account, except for cases when the project provides for the display of the same technological parameters (equipment status) on more than one terminal device (monitor, printer, interface panel, information board, etc.). The adjustment of information displays on the first terminal device is taken into account by the prices of this Collection.

In this case, when displaying information on each terminal device beyond the first, the displayed parameters ( TO but And and K d and ) are taken into account TO but And with coefficient0, 025, K d and with coefficient0, 01 .

Not taken into account as channels indicators (lamps, LEDs etc.) states and positions built into measuring transducers (sensors), contact or non-contact signaling devices, buttons, control keys, switches, as well as indicators of the presence of voltage of devices, recorders, terminal devices of panels, consoles, etc., the adjustment of which is taken into account by the prices of this Collection

5

sms

1, № 2, … , № i

Communication channels (interactions) analog and discrete information (C a and C d and) with related systems, made on separate projects. “The number of physical channels through which communication signals (interaction) with adjacent systems are transmitted is taken into account:

discrete - contact and non-contact direct and alternating current (with the exception of coded) and analog signals, the values ​​of which are determined on a continuous scale, as well as, for the purposes of this Collection, coded (pulse and digital)". Different kinds voltage electrical systems used as power sources for APCS equipment (shields, consoles, actuators, information converters, terminal devices, etc.) as communication channels (interactions) with adjacent systems are not taken into account.

(Changed edition. Rev. No. 1)

3. 1. 2. For each group of channels in Table. the number of information channels (analog and discrete) and control channels (analog and discrete) is counted, as well as e the total number of information and control channels ( TO common) for the system as a whole.

3.1. 3. Based on the table. the category of technical complexity of the system is established and, depending on TO commonaccording to the corresponding price table, the base price is determined (R b), if necessary, a basic price for a complex system is calculated(R sl b)- using formulas ( ) And ( ).

3. 1. 4. To link the base price to a specific system, correction factors are calculated F i mAnd F atin accordance with paragraphs. And , then the estimated price is calculated according to the formula ( ).

DEPARTMENT 01. AUTOMATED CONTROL SYSTEMS

Rate code

Name and technical characteristics of equipment

Direct costs (compensation of commissioning personnel), rub.

Labor costs, man-hour

Table 02-01-001 Automated control systems of the 1st category of technical complexity

Meter : system (rates 1 , 3 , 5 , 7 , 9 , 11 , 13 , 15 , 19 ); channel (rates 2 , 4 , 6 , 8 , 10 , 12 , 14 , 16 , 18 , 20 )

02- 01- 001- 02

TO common ):

190, 07

13, 4

02- 01- 001- 02

for each channel 2before 9add to rate 1

6, 45

02- 01- 001- 03

10

921, 99

65

02- 01- 001- 04

for each channel 10before 19add to rate 3

6, 3

02- 01- 001- 05

20

128

02- 01- 001- 06

for each channel 20before 39add to rate 5

87, 23

6, 15

02- 01- 001- 07

40

3560, 31

251

02- 01- 001- 08

for each channel 40before 79add to rate 7

6, 03

02- 01- 001- 09

80

6978, 77

492

02- 01- 001- 10

for each channel 80before 159add to rate 9

83, 40

5, 88

02- 01- 001- 11

160

13645, 49

962

02- 01- 001- 12

for each channel 160before 319add to rate 11

78, 72

5, 55

02- 01- 001- 13

320

26241, 32

02- 01- 001- 14

for each channel 320before 639add to rate 13

73, 62

5, 19

02- 01- 001- 15

640

49787, 59

02- 01- 001- 16

for each channel 640before 1279add to rate 15

62, 55

4, 41

02- 01- 001- 17

89787, 88

02- 01- 001- 18

for each channel 1280before 2559add to rate 17

49, 50

3, 49

02- 01- 001- 19

153192, 6

02- 01- 001- 20

for each channel 2560add to rate 19

40, 14

2, 83

Table 02-01-002 Automated control systems of the II category of technical complexity

Meter : system (rates 1 , 3 , 5 , 7 , 9 , 11 , 13 , 15 , 19 ); channel (rates 2 , 4 , 6 , 8 , 10 , 12 , 14 , 16 , 18 , 20 )

02- 01- 002- 01

System with number of channels (TO common ):

260, 59

17, 6

02- 01- 002- 02

for each channel 2before 9add to rate 1

125, 41

8, 47

02- 01- 002- 03

10

1258, 51

85

02- 01- 002- 04

for each channel 10before 19add to rate 3

122, 89

8, 3

02- 01- 002- 05

20

2487, 41

168

02- 01- 002- 06

for each channel 20before 39add to rate 5

119, 93

8, 1

02- 01- 002- 07

40

4885, 98

330

02- 01- 002- 08

for each channel 40before 79add to rate 7

117, 12

7, 91

02- 01- 002- 09

80

9564, 68

646

02- 01- 002- 10

for each channel 80before 159add to rate 9

7, 71

02- 01- 002- 11

160

18699, 98

02- 01- 002- 12

for each channel 160before 319add to rate 11

107, 94

7, 29

02- 01- 002- 13

320

35978, 58

02- 01- 002- 14

for each channel 320before 639add to rate 13

100, 83

6, 81

02- 01- 002- 15

640

68255, 66

02- 01- 002- 16

for each channel 640before 1279add to rate 15

5, 78

02- 01- 002- 17

123037, 86

02- 01- 002- 18

for each channel 1280before 2559add to rate 17

67, 81

4, 58

02- 01- 002- 19

209801, 02

02- 01- 002- 20

for each channel 2560add to rate 19

55, 08

3, 72

Table 02-01-003 Automated control systems of III category of technical complexity

Meter : system (rates 1 , 3 , 5 , 7 , 9 , 11 , 13 , 15 , 19 ); channel (rates 2 , 4 , 6 , 8 , 10 , 12 , 14 , 16 , 18 , 20 )

02- 01- 003- 01

System with number of channels (TO common ):

2

341, 85

21

02- 01- 003- 02

for each channel2before 9add to rate 1

164,41

10, 1

02- 01- 003- 03

10

1660, 41

102

02- 01- 003- 04

for each channel10before 19add to rate 3

159, 53

9, 8

02- 01- 003- 05

20

3255, 70

200

02- 01- 003- 06

for each channel20before 39add to rate 5

156, 76

9, 63

02- 01- 003- 07

40

6397, 45

393

02- 01- 003- 08

for each channel40before 79add to rate 7

153, 67

9, 44

02- 01- 003- 09

80

12534, 44

770

02- 01- 003- 10

for each channel80before 159add to rate 9

149, 76

9, 2

02- 01- 003- 11

160

24515, 42

1506

02- 01- 003- 12

for each channel160before 319add to rate 11

141, 62

8, 7

02- 01- 003- 13

320

47175, 09

2898

02- 01- 003- 14

for each channel320before 639add to rate 13

132, 18

8, 12

02- 01- 003- 15

640

89482, 91

5497

02- 01- 003- 16

for each channel640before 1279add to rate 15

112, 32

6, 9

02- 01- 003- 17

1280

161368, 77

9913

02- 01- 003- 18

for each channel1280before 2559add to rate 17

89, 04

5, 47

02- 01- 003- 19

2560

275350, 81

16915

02- 01- 003- 20

for each channel2560add to rate 19

72, 11

4, 43

MDS 81-40.2006

INSTRUCTIONS
FOR THE APPLICATION OF FEDERAL UNIT RATES
FOR COMMISSIONING
(FERp-2001)


DEVELOPED BY FSUE "Central Research Institute of Economics and Management in Construction" (TsNIIEUS) of Gosstroy of Russia (M.Yu.Matveev, Ph.D. Zh.G. (L.V. Razmadze).

REVIEWED by the Department of Pricing and Estimated Rationing in the Construction of the Gosstroy of Russia (Editorial Committee: V.A. Stepanov - Head, T.L. Grischenkova).

ADOPTED AND PUT INTO EFFECT by Decree of the Gosstroy of Russia dated 01.09.2003 N 160

1. GENERAL PROVISIONS

1. GENERAL PROVISIONS

1.1. These Directives establish a unified procedure for the application of collections of federal unit prices for commissioning work at enterprises under construction, reconstructed, expanded and technically re-equipped, buildings and structures being commissioned.

These Guidelines contain provisions that are common to all federal unit prices for commissioning (FERp) included in the FERp collections, a list of which is given in Appendix 1.

The technical parts and introductory instructions of the FERp collections contain provisions due to the peculiarities of commissioning during the commissioning of certain types of equipment, devices, systems that must be taken into account when using the corresponding FERp collections.

1.2. FERp collections are an integral part of the pricing and cost estimate regulation system in construction, operating on the territory of the Russian Federation.

FERp collections are developed according to the nomenclature of equipment for interbranch use.

For special technological equipment of enterprises and industries of economic sectors, industry unit prices for commissioning (OERp-2001) are developed, approved and put into effect by ministries, departments, other industry structures (associations, corporations) in agreement with the relevant authorized federal executive body in the region. construction.

1.3. The FERp collections can be used as a basis for the development of territorial unit prices for commissioning (TERp) collections, taking into account the range of work, construction conditions and the level of wages in the respective regions.

For objects financed from the federal budget, along with the territorial unit prices of TERp (and also in the absence of TERp in the regions, regardless of funding sources), federal unit prices (FERp) can be applied with their conversion to the territorial price level.

1.4. When developing Guidelines for the use of TERp, their provisions should not contradict the provisions of these Guidelines.

In the absence of Guidelines for the use of TERp, the requirements of these Guidelines must be met, taking into account the regional specifics of commissioning.

1.5. FERP are designed for:

- determination of direct costs as part of the estimated cost of commissioning;

- preparation of cost estimates (budgets) for commissioning by the base-index method;

- settlements between customers and contractors for the performed commissioning works;

- development of consolidated estimated standards used at the stage of feasibility studies for the construction of buildings and structures, for the preparation of investor estimates and the implementation of consolidated financial and economic calculations;

- planning and organization of commissioning works;

- economic analysis of construction costs when choosing optimal design solutions.

1.6. FERp reflect the industry average level of costs for the technology adopted in them and the organization of commissioning.

It is not allowed to adjust unit prices depending on the method of work, except for the cases provided for by these Instructions, as well as the technical parts and introductory instructions of the collections.

1.7. FERp collections are developed on the basis of the following conditions:

- equipment, as a rule, domestic, serial, complete, with technical documentation, with installed system and application software, the period of its storage in the warehouse does not exceed the standard;

- equipment defects identified during commissioning are eliminated by the customer, and installation defects - by the installation organization;

- commissioning works are carried out by organizations licensed to carry out these types of work; when performing work at facilities supervised by state technical supervision bodies, there are additional licenses from these departments;

- employees - performers of work have qualifications corresponding to the technical complexity of equipment, devices, systems, have passed the necessary training, attestation or certification, are provided with the necessary production equipment, measuring instruments, control and test benches, tools, protective equipment, etc.;

- commissioning works are carried out on the basis of the working documentation approved by the customer, if necessary - taking into account the project for the production of works (PPR), program and schedule;

The production of commissioning works is started if the customer has documents on the completion of the installation work provided for by SNiP (acts, protocols, etc.). In the event of forced breaks between installation and adjustment work for reasons beyond the control of the contractor, commissioning work is started after checking the safety of the previously installed equipment;

- switching of operating modes of technological equipment is carried out by the customer in accordance with the project, regulations and during the periods provided for by the agreed programs and work schedules;

- other conditions caused by the specific features of equipment, systems, structures, reflected in the relevant collections of FERp.

1.8. FERp collections are developed on the basis of:

- collections of state elemental estimated norms for commissioning (GESNp-2001), approved and put into effect by the Gosstroy of Russia. Each collection of FERp corresponds to a collection of GESNp with the same number and name;

- the level of remuneration for commissioning personnel, adopted on the basis of state statistical reporting data in construction for the base territorial region (Moscow Region) as of January 1, 2000.

1.9. FERp collections contain a technical part, introductory instructions to departments or sections, unit pricing tables and necessary appendices.

The technical parts of the collections contain provisions regarding the composition and procedure for applying the unit prices of this collection, specifying the provisions of these Instructions or differing from them. The provisions given in the technical part of any collection do not apply to other collections.

The introductory instructions to the departments and sections of the collections contain information on the procedure for applying unit prices for this department or section, due to the peculiarities of the commissioning of the relevant equipment. It is not allowed to apply introductory instructions to unit rates of other departments or sections.

1.10. FERp tables have a code, name, meter, similar to those given in the tables of GESNp of the corresponding collection.

The designation of the number (cipher) of the collections of unit prices (for example: FERp 81-04-01-2001) means:

FERp - federal unit prices for commissioning;

81 (first group of numbers) - code of estimated standards;

04 (second group of numbers) - code of collections of federal unit prices for commissioning;

01 (third group of numbers) - serial number of the FERp collection;

2001 (fourth group of figures) - the assigned year of issue of the estimated and regulatory framework developed in the price level as of 01/01/2000

The FERp rate code (for example; 01-01-001-01) consists of:

01 (first group of numbers) - collection number (two characters);

01 (second group of numbers) - department number (two characters);

001 (third group of numbers) - serial number of the table in this department (three characters);

01 (fourth group of digits) - serial number of the price (two digits).

1.11. In the FERp tables, the names and technical characteristics of the equipment contain the main features that affect the complexity of commissioning. The parameters of individual characteristics (capacity, power, volume, pressure, etc.) given with the word "up to" should be understood inclusively, and with the word "from" - excluding the indicated value, i.e. above.

1.12. The FERp tables contain indicators of estimated direct costs set for the corresponding meter of equipment or types of commissioning:

- direct costs (compensation of commissioning personnel), in rubles;

- labor costs, in man-hours

1.13. The FERP tables do not show:

- the cost of material (including energy) resources, raw materials and semi-finished products used in commissioning, including comprehensive testing of equipment provided by the customer;

- labor costs of operating personnel involved in the commissioning and comprehensive testing of equipment.

The cost of material resources, raw materials, semi-finished products, as well as the cost of maintaining operating personnel during the commissioning period are determined on the basis of design data and are taken into account in the estimate documentation in the manner set forth in clause 5 of these Instructions.

1.14. The prices take into account the costs for the implementation of a set of commissioning works, established taking into account the requirements:

State and industry standards;

- technical documentation of enterprises - manufacturers of equipment, instructions, technological regulations, guiding technical materials and other technical documentation for the installation, commissioning and operation of equipment;

- the relevant chapters of the 3rd part of SNiP "Organization, production and acceptance of work";

- bodies of state technical supervision for labor protection and safety, fire and gas safety, protection environment.

The composition of commissioning works, taken into account by prices, as a rule, includes:

- organizational and engineering preparation of works;

- study of design and technical documentation;

- Inspection of the facility, external inspection of equipment and completed installation work;

- participation in individual tests of equipment carried out by installation organizations;

- determination of compliance with the technical characteristics of the installed equipment technical requirements established by the technical documentation of the enterprises - manufacturers of equipment and the project;

- adjustment, adjustment of certain types of equipment included in the technological systems, blocks, lines, in order to ensure their interconnected work established by the project;

- trial run of equipment according to the design scheme in an inert environment with a check of readiness and adjustment of equipment operation complete with support systems - control, adjustment, blocking, protection, signaling, automation and communication, transfer of equipment to work under load;

- comprehensive testing of equipment with the adjustment of the technological process and the conclusion to a stable design technological regime, ensuring the release of the first batch of products (rendering services) provided for by the project, in the appropriate volume.

A detailed set of commissioning works, taken into account in unit prices, is given in the technical parts and introductory instructions of the FERp collections, as well as in the corresponding GESNp collections.

1.15. FERP collections, as a rule, do not take into account the costs of:

Electrical adjustment work, determined according to the collection FERp N 1 "Electrical devices";

- commissioning work on automated control systems (including process control systems), determined by the collection FERp N 2 "Automated control systems";

- commissioning work on other types of equipment and systems, about which the necessary information is available in the relevant collections.

1.16. The works provided for by department 02 "Testing and adjustment of ventilation and air conditioning systems for sanitary and hygienic (technological) requirements for the air environment" of the collection FERp N 3 "Ventilation and air conditioning systems" are carried out on operating enterprises(buildings and structures) upon reaching the design capacity.

The works included in department 08 "Mode and adjustment tests" of the Collection FERp N 7 "Heat power equipment" are also carried out at existing facilities in order to achieve the highest possible efficiency factor (COP) of boiler units at work loads.

The cost of the specified works on collections No. 3 and No. 7, not related to commissioning and performed only at existing enterprises, under a separate agreement with the customer, is not included in the summary estimate for the commissioning of an enterprise, building, structure.

1.17. The unit prices do not include the costs of the following works that are not related to commissioning:

- revision of equipment, elimination of its defects and installation defects, imperfections in construction and installation works; design work;

- adjustment and completion of application software and loading of equipment with software;

- development of operational and budget documentation;

- delivery of measuring instruments for state verification;

- coordination of work performed with supervisory authorities;

- Adjustment works during the period of development of the design capacity of facilities;

- maintenance and periodic checks of equipment during its operation.

1.18. The costs of commissioning during the commissioning of certain types of temporary buildings and structures (power plants, transformer substations, boiler houses, pumping stations, compressor stations, etc.) are related to the costs of construction of title temporary buildings and structures included in Chapter 8 "Temporary buildings and structures" of the consolidated estimate calculation of the cost of construction. The specified costs for commissioning are taken into account in the estimated cost rates for the construction of temporary buildings and structures (GSN 81-05-01-2001).

1.19. Commissioning costs incurred when relocating construction machines from one construction site (mechanization base) to another construction site (mechanization base), if this is associated with the dismantling and subsequent installation of construction machines (tower cranes, crawler cranes, pile driving equipment and etc.), are taken into account in the estimated norms and prices for the operation of the relevant construction machines.

1.20. In the FERp tables, the amount of funds for the remuneration of commissioning personnel is calculated on the basis of the labor intensity and composition of the link of work executors given in the relevant collections of GESNp, based on the cost of 1 man-hour by category of commissioning workers, given in Table 1.

Table 1

Cost of 1 man-hour, rub.

Chief Specialist

Lead Engineer

Working 6th category

Worker 5th category

Working 4 digits

Worker 3 category

Notes: 1. The cost of 1 man-hour is taken on the basis of the average level of wages in the base territorial region (Moscow region) as of January 1, 2000 in the amount of 1600 rubles. per month (1 man-hour - 9.62 rubles), which corresponds to the wages of a worker of the 4th category, with an average monthly standard number of working hours of 166.25 (with a 40-hour working week) - in accordance with the resolution of the Ministry of Labor of Russia dated 07.02 .2000 N 2092.

2. The composition of the cost of 1 man-hour includes labor costs (payroll), including compensation payments related to the regime and working conditions, as well as incentive bonuses and allowances (bonuses, remuneration, etc.).

1.21. When drawing up estimates (estimates) for commissioning, references to the technical part of the FERp collection should be indicated by its initial letters and the number of the corresponding paragraph, for example, PM-5, which should mean: technical part, paragraph 5. Similarly, references to introductory instructions to departments and sections of collections are indicated by VU with the addition of a paragraph number.

2. PROCEDURE FOR APPLICATION OF FEDERAL UNIT PRICES FOR COMMISSIONING WORKS

2.1. Unit rates provide for the implementation of commissioning under normal conditions, not complicated external factors, at a positive ambient temperature. The costs associated with the issuance of special work permits, special passes or permits are not included in the rates.

When performing commissioning work in more difficult production conditions compared to those provided for in the FERp collections, as a result of which the labor productivity of the work performers decreases, the coefficients given in Table 2 must be applied to wages and labor costs.

table 2

Work conditions

Coeffi-
cent

At operating enterprises (in workshops, buildings, at production sites) in the presence of operating technological equipment in the production area, or an extensive network of engineering communications, or dusty air, or the movement of technological transport along intra-shop and intra-factory routes, which directly affects the performance of commissioning

The same, at the enterprises of the metallurgical, chemical and petrochemical industries

At enterprises (in workshops, buildings, at production sites) stopped for work on reconstruction, expansion, technical re-equipment, as well as in buildings and structures for all purposes, if there are objects cluttering up the premises (machines, installations, apparatus, operational and laboratory equipment, office equipment, furniture, etc.)

In the security zone of overhead power lines, in places where power supply communications pass, in existing electrical installations, (without issuing a work permit or order) near structures and objects that are under voltage (in cases where complete removal of voltage due to production conditions is impossible), if this associated with the limitation of the actions of the performers of work by special safety requirements

In electrical installations that are energized with the execution of a work permit or order

On electrical devices in operating nuclear installations with the issuance of a work permit or order

On electrical equipment protected from environmental influences by design: dust-, explosion-, splash-, waterproof, hermetic, protected from aggressive environments

Near sources of ionizing radiation

In operating workshops of enterprises with harmful conditions labor in which workers industrial enterprise a reduced working day is established, and workers performing commissioning work have a normal working day

The same, if available, in addition:

working conditions specified in paragraph 1

production conditions specified in paragraph 2

In operating workshops of enterprises with harmful working conditions, if workers involved in commissioning work are transferred to a shortened working day:

with a 36 hour work week

with a 30 hour work week

with a 24 hour work week

When the air temperature at the workplace is more than 40 ° C in the premises

When the air temperature at the workplace is below 0 °C

At high-security facilities where, due to the secrecy regime, a special permit, a special pass and other restrictions for commissioning personnel are applied

In enclosed structures (premises) located below 3 m from the ground, with the exception of mines, mines, subways, tunnels and underground structures special purpose

At facilities located in mountainous areas at an altitude above sea level

from 1500 to 2500 m

from 2500 to 3000 m

from 3000 to 3500 m

Notes: 1. The use of coefficients must be justified by the project data or the program of work agreed with the customer. In this case, the coefficients are applied to the costs of those stages of work that are actually performed in more difficult production conditions.

2. Commissioning work carried out in existing electrical installations includes work performed after the introduction of the operating mode at this electrical installation - in accordance with the provisions given in paragraph 4 of SNiP 3.05.06-85 "Electrical devices".

3. The coefficients given in Table 2 are not used in the performance of work in underground conditions in subways, tunnels and underground structures for special purposes, with the exception of the coefficients given in paragraphs 4 and 5.

4. When performing work under the conditions specified in Table 2, only one of the coefficients can be applied. The exception is the coefficients given in paragraphs 4, 5, 13, 14, 15 and 18, each of which can be applied simultaneously with one of the other coefficients contained in this table (in this case, the coefficients are multiplied).

5. It is recommended to include work in the presence of lead, zinc, mercury, heavy metal dust, radiation, as well as work in existing healthcare enterprises (tuberculosis dispensaries, leper colonies, etc.), where, in accordance with current legislation, for employees of the main production set a shortened working day.

2.2. When determining the estimated cost of commissioning works performed underground in mines, mines, subways, tunnels and underground structures for special purposes, it is necessary to apply the coefficients given in Table 3 to the prices (to the remuneration of commissioning personnel).

Table 3

Name of work places

Coeffi-
cent

Works on the surface of existing and under construction mines, mines, subways, tunnels and underground structures for special purposes

On the construction, technical re-equipment and reconstruction of subways, tunnels and underground structures for special purposes - when open method works
If the payment procedure on the website of the payment system has not been completed, cash
funds will NOT be debited from your account and we will not receive confirmation of payment.
In this case, you can repeat the purchase of the document using the button on the right.

An error has occurred

The payment was not completed due to a technical error, cash from your account
were not written off. Try to wait a few minutes and repeat the payment again.

The Directives establish a unified procedure for the application of collections of federal unit prices for commissioning works at enterprises under construction, reconstruction, expansion and technical re-equipment, buildings and structures that are being commissioned.

Designation: MDS 81-40.2006
Russian name: Guidelines for the application of federal unit prices for commissioning (FERp-2001)
Status: valid
Text update date: 05.05.2017
Date added to database: 01.09.2013
Date of entry into force: 01.09.2003
Approved: 09/01/2003 Gosstroy of Russia (Russian Federation Gosstroy 160)
Published: GUP TsPP (CPP GUP 2006)
Download links:

STATE COMMITTEE OF THE RUSSIAN FEDERATION
FOR CONSTRUCTION AND HOUSING AND UTILITIES
COMPLEX

(Gosstroy of Russia)

INSTRUCTIONS
BY APPLICATION
FEDERAL UNIT RATES
FOR COMMISSIONING
(FERp-2001)

MDS 81-40.2006

Moscow 2006

DEVELOPED

Federal State Unitary Enterprise "Central Research Institute of Economics and Management in Construction" (TsNIIEUS) of the State Construction Committee of Russia (M.Yu. Matveev, Ph.D. Zh.G. Chernysheva), LLC "Coordinating Center for Pricing and Estimated Rationing in Construction ( L.V. Razmadze).

CONSIDERED

Department of Pricing and Estimated Rationing in the Construction of the Gosstroy of Russia (Editorial Committee: V.A. Stepanov - Head, T.L. Grishchenkova).

ACCEPTED AND INTRODUCED

Decree of the Gosstroy of Russia dated 01.09.2003 No. 160

The technical parts and introductory instructions of the FERp collections contain provisions due to the peculiarities of commissioning during the commissioning of certain types of equipment, devices, systems that must be taken into account when using the corresponding FERp collections.

1.2. FERp collections are an integral part of the pricing and cost estimate regulation system in construction, operating on the territory of the Russian Federation.

FERp collections are developed according to the nomenclature of equipment for interbranch use.

For special technological equipment of enterprises and industries of economic sectors, industry unit prices for commissioning works (ОERp - 2001) are developed, approved and put into effect by ministries, departments, other industry structures (associations, corporations) in agreement with the relevant authorized federal executive body in the region. construction.

1.3. The FERp collections can be used as a basis for the development of territorial unit prices for commissioning (TERp) collections, taking into account the range of work, construction conditions and the level of wages in the respective regions.

For objects financed from the federal budget, along with the territorial unit prices of TERp (and also in the absence of TERp in the regions, regardless of funding sources), federal unit prices (FERp) can be applied with their conversion to the territorial price level.

1.4. When developing Guidelines for the use of TERp, their provisions should not contradict the provisions of these Guidelines.

In the absence of Guidelines for the use of TERp, the requirements of these Guidelines must be met, taking into account the regional specifics of commissioning.

1.5. FERP are designed for:

Determining direct costs as part of the estimated cost of commissioning;

Preparation of cost estimates (budgets) for commissioning works using the base-index method;

Settlements between customers and contractors for completed commissioning;

Development of consolidated estimated standards used at the stage of feasibility studies for the construction of buildings and structures, for the preparation of investor estimates and the implementation of consolidated financial and economic calculations;

Planning and organizing the production of commissioning works;

Economic analysis of construction costs when choosing optimal design solutions.

1.6. FERp reflect the industry average level of costs for the technology adopted in them and the organization of commissioning.

It is not allowed to adjust unit prices depending on the method of work, except for the cases provided for by these Instructions, as well as the technical parts and introductory instructions of the collections.

1.7. FERp collections are developed on the basis of the following conditions:

The equipment, as a rule, is domestic, serial, complete, with technical documentation, with installed system and application software, its storage period in the warehouse does not exceed the standard;

Equipment defects identified during commissioning are eliminated by the customer, and installation defects - by the installation organization;

Commissioning works are carried out by organizations licensed to carry out these types of work; when performing work at facilities supervised by state technical supervision bodies, there are additional licenses from these departments;

Employees - performers of work have a qualification corresponding to the technical complexity of equipment, devices, systems, have passed the necessary training, attestation or certification, are provided with the necessary production equipment, measuring instruments, test benches, tools, protective equipment, etc.;

Commissioning works are carried out on the basis of the working documentation approved by the customer, if necessary, taking into account the project for the production of works (PPR), program and schedule;

The production of commissioning works is started if the customer has documents on the completion of the installation work provided for by SNiP (acts, protocols, etc.). In the event of forced breaks between installation and adjustment work for reasons beyond the control of the contractor, commissioning work is started after checking the safety of the previously installed equipment;

Switching of operating modes of technological equipment is carried out by the customer in accordance with the project, regulations and within the periods provided for by the agreed programs and work schedules;

Other conditions caused by the specific features of equipment, systems, structures, reflected in the relevant collections of FERp.

1.8. FERp collections are developed on the basis of:

Collections of state elemental estimated norms for commissioning (GESNp-2001), approved and put into effect by the Gosstroy of Russia. Each collection of FERp corresponds to a collection of GESNp with the same number and name;

The level of remuneration for commissioning personnel, adopted on the basis of state statistical reporting data in construction for the base territorial region (Moscow Region) as of January 1, 2000.

1.9. FERp collections contain a technical part, introductory instructions to departments or sections, unit pricing tables and necessary appendices.

The technical parts of the collections contain provisions regarding the composition and procedure for applying the unit prices of this collection, specifying the provisions of these Instructions or differing from them. The provisions given in the technical part of any collection do not apply to other collections.

The introductory instructions to the departments and sections of the collections contain information on the procedure for applying unit prices for this department or section, due to the peculiarities of the commissioning of the relevant equipment. It is not allowed to apply introductory instructions to unit rates of other departments or sections.

1.10. FERp tables have a code, name, meter, similar to those given in the tables of GESNp of the corresponding collection.

The designation of the number (cipher) of the collections of unit prices (for example: FERp 81-04-01-2001) means:

FERp - federal unit prices for commissioning;

81 (first group of numbers) - code of estimated standards;

04 (second group of numbers) - code of collections of federal unit prices for commissioning;

01 (third group of numbers) - serial number of the FERp collection;

2001 (fourth group of figures) - the assigned year of issue of the estimated and regulatory framework developed in the price level as of 01/01/2000

The FERp rate code (for example: 01-01-001-01) consists of:

01 (first group of numbers) - collection number (two characters);

01 (second group of numbers) - department number (two characters);

001 (third group of numbers) - serial number of the table in this department (three characters);

01 (fourth group of digits) - serial number of the price (two digits).

1.11. In the FERp tables, the names and technical characteristics of the equipment contain the main features that affect the complexity of commissioning. The parameters of individual characteristics (capacity, power, volume, pressure, etc., given with the word "to", should be understood inclusive, and with the word "from" - excluding the indicated value, i.e. above.

1.12. The FERp tables contain indicators of estimated direct costs set for the corresponding meter of equipment or types of commissioning:

Direct costs (compensation of commissioning personnel), in rubles;

Labor costs, man-hours

1.13. The FERP tables do not show:

The cost of material (including energy) resources, raw materials and semi-finished products used in commissioning, including comprehensive testing of equipment provided by the customer;

Labor costs for operating personnel involved in the commissioning and comprehensive testing of equipment;

The cost of material resources, raw materials, semi-finished products, as well as the cost of maintaining operating personnel during the commissioning period are determined on the basis of design data and are taken into account in the estimate documentation in the manner set forth in paragraphs of these Instructions.

Cost of 1 man-hour, rub.

Chief Specialist

Lead Engineer

Working 6th category

Worker 5th category

Working 4 digits

Worker 3 category

Notes: 1. The cost of 1 man-hour is taken on the basis of the average level of wages in the base territorial region (Moscow region) as of January 1, 2000 in the amount of 1600 rubles. per month (1 man-hour - 9.62 rubles), which corresponds to the wages of a worker of the 4th category, with an average monthly standard number of working hours of 166.25 (with a 40-hour working week) - in accordance with the resolution of the Ministry of Labor of Russia dated 07.02 .2000 No. 2092.

2. The cost of 1 man-hour includes labor costs (payroll), including compensation payments related to the regime and working conditions, as well as incentive bonuses and allowances (bonuses, rewards, etc.).

1.21. When compiling estimates (estimates) for commissioning, references to the technical part of the FERp collection should be indicated by its initial letters and the number of the corresponding paragraph, for example, PM-5, which should mean: technical part, paragraph 5. Similarly, links to introductory instructions to departments and sections of collections are designated by VU with the addition of the item number.

2. PROCEDURE FOR APPLICATION OF FEDERAL SINGLE

2.1. Unit rates provide for commissioning under normal conditions, not complicated by external factors, at a positive ambient temperature. The costs associated with the issuance of special work permits, special passes or permits are not included in the rates.

When performing commissioning work in more difficult production conditions compared to those provided for in the FERp collections, as a result of which the labor productivity of the work performers decreases, it is necessary to apply the coefficients given in to wages and labor costs.


pp.

Work conditions

Coefficient

At operating enterprises (in workshops, buildings, at production sites) in the presence of operating technological equipment in the production area, or an extensive network of engineering communications, or dusty air, or the movement of technological transport along intra-shop and intra-factory routes, which directly affects the performance of commissioning

The same, at the enterprises of the metallurgical, chemical and petrochemical industries

At enterprises (in workshops, buildings, at production sites) stopped for work on reconstruction, expansion, technical re-equipment, as well as in buildings and structures for all purposes, if there are objects cluttering up the premises (machines, installations, apparatus, operational and laboratory equipment, office equipment, furniture, etc.)

In the security zone of overhead power lines, in places where power supply communications pass, in existing electrical installations, (without issuing a work permit or order) near structures and objects that are under voltage (in cases where complete removal of voltage due to production conditions is impossible), if this associated with the restriction of the actions of the performers of the work special requirements safety precautions

In electrical installations that are energized with the execution of a work permit or order

On electrical devices in operating nuclear installations with the issuance of a work permit or order

On electrical equipment protected from environmental influences by design: dust-, explosion-, splash-, waterproof, hermetic, protected from aggressive environments

Near sources of ionizing radiation

In operating workshops of enterprises with harmful working conditions, in which the workers of an industrial enterprise have a reduced working day, and workers performing commissioning work have a working day of normal duration

The same, if available, in addition:

production conditions specified in paragraph 1

production conditions specified in paragraph 2

In operating workshops of enterprises with harmful working conditions, if workers involved in commissioning work are transferred to a shortened working day:

When the air temperature at the workplace is more than 40 ° C in the premises

When the air temperature in the non-working place is below 0 °С

At high-security facilities where, due to the secrecy regime, a special permit, a special pass and other restrictions for commissioning personnel are applied

In enclosed structures (premises) located below 3 m from the ground, with the exception of mines, mines, subways, tunnels and underground structures for special purposes

At facilities located in mountainous areas at an altitude above sea level

from 1500 to 2500 m

from 2500 to 3000 m

from 3000 to 3500 m

Notes: 1. The use of coefficients must be justified by the project data or the program of work agreed with the customer. In this case, the coefficients are applied to the costs of those stages of work that are actually performed in more difficult production conditions.

2. Commissioning works carried out in existing electrical installations include work performed after the introduction of the operating mode at this electrical installation - in accordance with the provisions given in paragraph 4 of SNiP.05.06-85 "Electrical devices".

3. The coefficients given in do not apply when performing work in underground conditions in subways, tunnels and underground structures for special purposes, with the exception of the coefficients given in paragraphs. 4 and 5.

4. When performing work under the conditions provided for in, only one of the coefficients can be applied. The exception is the coefficients given in paragraphs. 4, 5, 13, 14, 15 and 18, each of which can be applied simultaneously with one of the other coefficients contained in this table (in this case, the coefficients are multiplied).

5. It is recommended to include work in the presence of lead, zinc, mercury, heavy metal dust, radiation, as well as work in existing healthcare enterprises (tuberculosis dispensaries, leper colonies, etc.), where, in accordance with current legislation, for employees of the main production set a shortened working day.

2.2. When determining the estimated cost of commissioning work performed underground in mines, mines, subways, tunnels and underground structures for special purposes, it is necessary to apply the coefficients given in to the prices (to the remuneration of commissioning personnel).

no.

Name of work places

Coefficient

Works on the surface of existing and under construction mines, mines, subways, tunnels and underground structures for special purposes

On the construction, technical re-equipment and reconstruction of subways, tunnels and underground structures for special purposes - with an open method of work

For underground work:

at existing and under construction enterprises of the mining and chemical industry, ferrous and non-ferrous metallurgy, building materials industry, construction, technical re-equipment and reconstruction of subways, tunnels and underground structures for special purposes

in the construction, reconstruction, technical re-equipment of coal and shale mines:

with a 36 hour work week

with a 30 hour work week

with a 24 hour work week

In underground conditions in operated subway tunnels at night after de-energizing (in the "window"):

when using workers during the work shift only to perform work related to the "window"

when using part of the work shift (before the workers enter the tunnel and after leaving the tunnel) to perform work not related to the "window"

Notes:1. When performing work under the conditions provided for in, only one of the coefficients can be applied.

2. Application of the coefficients given in paragraphs. 7 and 8, with preparation of budget documentation should be justified by project data.

The use of a collection of estimated norms of additional costs in the production of construction and installation works in winter (GSN 81-05-02-2001) when determining the cost of commissioning is not allowed.

2.4. Commissioning work on elevators of any carrying capacity is carried out only according to their electrical systems. The cost of these works is determined according to the prices of the FERp collection No. 1 "Electrical devices", department 14 "Electric elevators". The costs of static and dynamic testing, adjustment and tuning of equipment and mechanisms of elevators (mechanical part), ensuring the commissioning of elevators, are taken into account by the prices of the collection of federal unit prices for equipment installation (FERm) No. 3 "Handling and transport equipment" and in estimates for commissioning jobs are not included.

2.5. In cases where commissioning is carried out on several units of the same type of equipment, prices for the second and subsequent units of equipment should be taken with a reduction factor specified in the technical part or introductory instructions of the relevant collection.

2.9. When paying for the commissioning work performed, when the contract provides for an interim payment, one should be guided by the composition and structure (by stages) of these works given in the technical parts or introductory instructions of the GESNp collections (unless other conditions for mutual settlements are provided by the contract). Calculations are made only for completed stages of work, subject to the completion of a complete list of works (operations) provided for by the content of this stage.

3. PROCEDURE FOR DETERMINING UNIT PRICES
FOR EQUIPMENT NOT IN THE COLLECTIONS
FERp

3.1. In the absence of certain types of equipment, including imported equipment, in the FERp collections, the prices for commissioning can be determined:

For equipment similar in purpose, technical characteristics and design complexity given in the collection - at a price for this equipment, without its adjustment (as applicable);

For experimental or experimental equipment - at a price for similar equipment with a coefficient of 1.2;

In the absence of analogue equipment in the existing FERp - on the basis of an individual unit price, developed in accordance with the procedure set forth in paragraph.

4. ORDER OF DEVELOPMENT OF INDIVIDUAL SINGLE
PRICES FOR COMMISSIONING

4.1. Individual unit prices for commissioning are developed by customer organizations, contractors, design and other interested organizations in cases where there are no relevant types of equipment (works) or their analogues in the FERp collections, including for equipment imported, non-standardized or single-piece production.

4.2. The calculation of an individual unit price is carried out according to Appendix 2, taking into account the following requirements:

4.2.1. Column 3 of the individual rate includes a detailed list of work performed (labor processes) in accordance with the regulatory and technical documentation given in paragraph.

The composition of the commissioning work should not include the work listed in paragraph , as not related to commissioning.

4.2.2. The composition of the unit (team) of commissioning performers is established on the basis of regulatory and technical documentation, in accordance with the current ETKS of works and professions, taking into account safety regulations.

4.2.3. Labor costs of commissioning personnel should be taken on the basis of labor costs standards approved in accordance with the established procedure, and in their absence, determined by the methods of technical labor rationing (timing, self-photography of labor processes, etc.). If it is impossible to use the methods of technical regulation, labor costs are determined on the basis of the method of expert assessments. one

________________

1 The methodology for determining the norms of labor costs for commissioning based on the method of expert assessments was developed by VNIPItruda in construction in 1989.

4.2.4. The cost of 1 man-hour for the categories of workers performing commissioning works at the base price level as of January 1, 2000 is accepted in accordance with these Instructions. Overhead costs and estimated profit are not included in unit rates.

4.2.5. Individual unit prices that meet necessary requirements, are approved by the customer as part of the estimate documentation for commissioning.

For objects being built with the involvement of federal budget funds, individual unit prices are applied after their agreement with the relevant authorized federal executive body in the field of construction.

4.3. Individual unit prices developed on the basis of individual standards that have been tested are recommended to be sent by interested organizations to the Federal State Unitary Enterprise TsNIIEUS Rosstroy for systematization and subsequent inclusion as additions to the current collections of GESNp and FERp.

5. DETERMINING THE ESTIMATED COST
COMMISSIONING

5.1. The estimated cost of commissioning at the current price level can be calculated:

By the resource method - on the basis of GESNp in the manner set forth in the Instructions for the Application of State Elemental Estimated Standards for Commissioning (MDS 81-27.2001);

By the base-index method - on the basis of unit prices (FERp, TERp) in the manner set forth in paragraph .., using current and forecast indices in relation to costs calculated at the base price level as of January 1, 2000.

Current (forecast) indices are developed, as a rule, regional centers on pricing in construction in accordance with guidelines Gosstroy of Russia.

Indexes may also be developed by contracting authorities, contractors or other organizations on their behalf.

5.2. When determining the estimated cost of a full range of commissioning works on the basis of GESNp, FERp, TERp, it is necessary to take into account the following procedure for allocating costs in the estimate documentation:

5.2.1. Idle commissioning costs related to capital costs are included in chapter 9 "Other work and costs" (columns 7 and 8) of the consolidated construction cost estimate.

The limit of funds for commissioning work "idle" in the summary estimate of the cost of construction is provided by the design organization in the amount agreed with the customer (investor), based on the data of analogous objects, aggregated estimated standards, other data of the customer.

5.2.2. Start-up and adjustment costs "under load", as non-capital expenses, are included in the summary estimate for putting the enterprise, building, structures into operation and include:

by objects industrial purpose- to the main activity of the operating organization (enterprise) with inclusion in the cost of production;

for non-industrial purposes - to the costs of maintaining the building, structure.

5.2.4. Calculations for commissioning are carried out on the basis of a local estimate, which, on behalf of the customer, can be drawn up by both the design and commissioning organizations.

When the contractor performs a full range of work in accordance with the contract, payment is subject to the full amount of the specified work. In this case, the customer uses different sources of funds:

For the production of commissioning works "idle" - due to the consolidated estimate calculation of the cost of construction;

For the production of commissioning works "under load" - at the expense of the summary estimate for the commissioning of an enterprise, building, structure.

STRUCTURE
a full range of commissioning works, taken into account in the collections of state
elemental estimated norms (GESNp-2001) and federal unit prices
(FERp-2001) for commissioning, commissioned
Gosstroy of Russia in 2000-2003.

№№
collections

№№
departments

№№
sections

№№
tables

Share of start-up and adjustment works "idle", %

The share of commissioning works "under load",%

No. 1 "Electrical devices"

No. 2 "Automated control systems"

No. 3 "Ventilation and air conditioning systems"

No. 4 "Handling and transport equipment"

No. 5 "Metalworking equipment"

No. 6 Refrigeration and compressor units

No. 7 "Heat power equipment"

No. 8 "Woodworking equipment"

No. 9 "Water supply and sewerage facilities"

Other types of technological equipment

Accepted according to the customer

* Note: The works provided for in section 02 of the collection No. 3 and in section 08 of the collection No. 7 do not apply to commissioning and are carried out at existing enterprises under a separate agreement with the customer.

It is allowed to use other forms that are more convenient for users.

If necessary, an object estimate calculation (object estimate) can be drawn up according to the summary estimate.

The forms of estimate documentation allow you to compile it in a certain sequence, moving from local estimate calculations (local estimates), which are primary estimate documents and are compiled on certain types works, to the object and summary estimates, which determine the estimated limit of funds necessary for the full completion of the work provided for by the project.

In some cases, when only one type of commissioning work is performed at the facility by a contractor, a local estimate calculation (local estimate) is used as a summary estimate. At the same time, at the end of the local estimate calculation (local estimate), other costs, a reserve of funds for unforeseen work and costs, as well as the amount of funds for paying VAT are included.

5.3.3. During the construction of housing and civil facilities, the commissioning of which is not related to the production of products, summary estimates are compiled on the basis of local estimates (local estimates) and calculations of other costs.

5.4. Summary estimates for the commissioning of enterprises, buildings, structures.

5.4.1. Summary estimates for the commissioning of enterprises, buildings, structures (hereinafter referred to as summary estimates) are documents that determine the estimated limit of funds required for commissioning "under load", comprehensive testing of equipment with the release of the first batch of products, ensuring the commissioning of newly built, reconstructed, expanded and technically re-equipped facilities.

5.4.2. Consolidated estimates are compiled on the basis of:

Technical and technical and economic indicators of the project;

The duration of the start-up period, comprehensive testing of equipment and other standards established by departmental (industry) regulations and instructions;

Production programs and schedules;

Sectoral rules for acceptance into operation of completed construction facilities, workshops and industries;

Local calculations (local estimates), calculations, agreements, contracts and other necessary data.

5.4.3. The summary estimate is compiled according to Appendix 3. It includes in separate lines the totals for all local estimates (local estimates) and other primary estimate documentation for certain types of costs. The positions of the summary estimate must have a link to the number of the specified documents.

5.4.4. In the consolidated budget, funds are distributed, as a rule, according to the following chapters:

1. Commissioning (“under load”) performed by contractors.

2. Raw materials and material resources.

4. Other works and expenses.

If necessary, taking into account the characteristics of individual sectors of the economy, the names and nomenclature of the chapters of the summary estimate can be changed.

Inside the chapters of the summary estimate, objects, production or complexes can be allocated into separate sections.

5.4.5. The summary estimate should provide for a reserve of funds for unforeseen work and costs, intended to reimburse the cost of:

Additional or rework, the need for which arises during the commissioning of an enterprise, building, structure;

Additional costs due to a possible increase in the cost of material resources, services, an increase in wages;

Compensable other costs of contractors, if the actual costs confirmed in the prescribed manner exceeded the amount of funds provided for in Chapter 4 "Other Works and Costs".

The reserve of funds is determined from the total of chapters 1 - 4 in the amount of not more than 2% for social facilities and no more than 3% for industrial facilities and is distributed among the relevant chapters of the summary estimate in proportion to the estimated cost of work and costs.

5.4.6. The following totals are given in the summary estimate: for each chapter (if there are sections in the chapter, for each section), for the sum of chapters 1 - 4, and also after accruing a reserve of funds for unforeseen work and costs - “Total according to the summary estimate”.

Following the summary of the summary estimates are indicated:

Refundable amounts, taking into account the cost of finished products and work in progress, received during the period of complex testing of equipment and the release of the first batch of products provided for by the project. Refunds are calculated on the basis of the production program, taking into account current prices. The cost of substandard products, marriage and waste is determined at the prices of their possible sale or disposal (if it is impossible to sell marriage and waste, their cost is not taken into account in the refundable amounts);

The amount of value added tax (VAT) in the amount established by the legislation of the Russian Federation.

5.4.7. An explanatory note is drawn up for the summary estimate, which provides the necessary information about the enterprise, technical and economic indicators of the project, organizations involved in ensuring the commissioning of the enterprise, the composition of the estimate documentation, the standards used and other data.

5.5. Local estimates (local estimates).

5.5.1. Local estimates (local estimates) are compiled for types of commissioning works in accordance with the specialization of contract commissioning organizations: for electrical devices, automated control systems, ventilation systems, process equipment, etc.

5.5.2. Local estimate calculation (local estimate) is compiled according to Appendix 3 on the basis of:

Project and working documentation (RD), including specifications and statements for equipment, drawings, diagrams, as well as explanatory notes to design materials;

Technical documentation, programs for commissioning;

The current estimated standards for commissioning - collections FERp, TERp, OERp;

Individual unit prices for commissioning - for equipment and types of work that are not in the current estimated standards;

The current standards for overhead costs and estimated profit for commissioning.

5.5.3. The amount of funds for the remuneration of commissioning personnel in local estimates is calculated taking into account the application to direct costs (wages) of the adjustment factors given in the relevant collections of unit prices and these Instructions.

The use of coefficients that take into account more complex conditions for the production of work, when drawing up estimates, should be justified by the project, and when calculating for the work performed, by acts fixing the actual conditions for performing the work.

5.5.4. In local estimates, a separate line may include the costs of operating production equipment directly used during commissioning (expensive instruments, equipment, electronic computers, mobile testing laboratories etc.), which are not taken into account as part of the overhead costs for commissioning.

The cost of operating such production equipment is determined on the basis of a calculation, based on the duration of its use according to production needs (machine-hour) and the cost of 1 machine-hour, calculated in accordance with Guidelines on the development of estimated norms and prices for the operation of construction machines and vehicles (MDS 81-3.99).

5.5.5. If necessary, local estimates may also take into account the costs of auxiliary non-standardized materials, bearing in mind that the costs of the main material resources provided by the customer are taken into account in chapter 2 of the summary estimate.

The cost of these auxiliary materials is determined by calculation, based on their consumption according to contractors agreed with the customer, and estimated prices free of charge on-site warehouse.

5.5.6. Overhead costs as part of local estimates (local estimates) for commissioning are determined in accordance with the Guidelines for determining the amount of overhead costs in construction (MDS 81-33.2004, MDS 81-34.2004).

Estimated profit is determined in accordance with the Guidelines for determining the amount of estimated profit in construction (MDS 81-25.2001), with subsequent additions and changes.

5.5.7. From the total estimated cost of commissioning, calculated according to the local estimate, the costs for performing work "idle" and "under load" are allocated (including) - in accordance with clause.

5.5.8. Estimates for repeated and additional commissioning works (item ) are compiled separately from the main local estimates. The costs of re-performing commissioning works to correct defects or deviations from the work production technology are not included in these estimates.

5.6. Determining the cost of raw material resources.

5.6.1. Chapter 2 of the summary estimate includes the cost of raw materials, basic and auxiliary materials, purchased products, semi-finished products that form the basis of manufactured products or are necessary components during its manufacture, as well as fuel, electricity, steam, water and other resources consumed during the period of commissioning, commissioning and comprehensive testing of equipment with the release of the first batch of products in the appropriate volume.

The cost of raw materials, material and energy resources is determined on the basis of the estimated calculation, compiled according to Appendix 3.

5.6.2. The consumption of raw materials, materials and energy resources is taken according to the technical and economic part of the project, taking into account the duration of commissioning and the production program.

The cost of raw materials, material and energy resources is calculated according to the current tariffs for energy resources, current prices for raw materials, products, materials, taking into account the costs of containers and packaging, transport, handling operations, services of intermediary organizations, procurement and storage costs, etc.

5.7. Determining the cost of maintenance of operational personnel.

5.7.1. Chapter 3 of the consolidated estimate includes the cost of maintaining the operational personnel, determined on the basis of the cost estimate drawn up according to Appendix 3.

Maintenance personnel costs are calculated based on the following inputs:

The number of main production workers (operators, operators, machinists, etc.), auxiliary workers, engineering and technical workers and employees, junior service personnel involved for the period of commissioning, including a comprehensive testing of equipment;

Duration of participation of each category of employees in commissioning (in working days) and complex testing of equipment (in hours);

Operating in the industry tariff rates and salaries, taking into account the necessary deductions for social needs in accordance with applicable law.

5.7.2. The cost of maintenance of operating personnel during the period of development of the design capacity of production facilities is not included in the summary estimate for commissioning.

5.8. Other work and expenses.

5.8.1. Chapter 4 of the consolidated estimate includes the amounts of funds spent by the customer for reimbursement in the form of compensation for the costs of contracting commissioning organizations that are not directly related to the implementation of commissioning.

When including other work and costs in Chapter 4 of the consolidated estimate, it is necessary to be guided by their composition and the procedure for determining, given in Appendix No. 8 to the Methodology for determining the cost of construction products on the territory of the Russian Federation (MDS 81-35.2004).

In addition, Chapter 4 of the consolidated estimate may include the cost of preparing estimates for commissioning, determined on the basis of actual labor costs agreed with the customer. At the same time, the cost of work on the preparation of estimates should not exceed 1% of the estimated cost of commissioning.

Local estimate calculation No. _________
(local estimates)

on the _____________________________________________

name of commissioning works, name of the object

Base: ( specification, drawings, diagrams, etc.)

Estimated cost _________________________ thousand rubles.

Compiled at prices as of ___________ 200 __

no.

Justification (code of a unit price; number of an individual price, justification of coefficients, etc.)

Name and technical characteristics of equipment or types of work

Unit meas.

Project Quantity

Cost, rub.

units

Total

Compiled by:

Checked:

__________________________________________________

name of the enterprise, building, structure

Estimated calculation No. _______
the cost of raw materials, material and fuel energy resources
for commissioning and complex testing of equipment

The cost of raw materials
and fuel and energy
resources _____________________ thousand rubles.

Compiled at prices as of ______________ 200___.

no.

Justification of the estimated cost

Name of raw materials, materials, fuel and energy resources

Unit
meas.

Consumption of raw materials, materials, fuel and energy resources

Cost, rub.

on the
units meas.

for the period of commissioning and production programs during the period of complex testing of equipment

units meas.

Total

Compiled by:

Checked:

__________________________________________________

name of the enterprise, building, structure

Estimated calculation No. __________
operating costs
personnel for the period of commissioning
and complex testing of equipment

Maintenance cost
operating personnel _____________ thousand rubles.

Duration of commissioning ______________ working days

Duration of complex testing of equipment ___________ hours

Compiled at prices as of ____________ 200__.



pp

Name of professions and positions, category or category

Quantity

Number of working days (hours)
for a period of

Total labor costs, man-days (man-hours)

Daily (hourly) rate according to the tariff or salary, rub.

Total cost, rub. (gr. 8´