Position foreman in construction. Job description for the site foreman, job duties for the site foreman, sample job description for the site foreman

Master of construction and installation works - a position belonging to the category of engineering and technical workers (ITR), and having the status of a leader in the job hierarchy of organizations.

If, when preparing a job description until 2016, it was possible to use the Unified Qualification Directory for the positions of managers, specialists and employees, then with the introduction of professional standards it is better to contact them. Why? Because the position of the master of construction and installation works belongs to the category of positions that have benefits when assigning a pension, and therefore, when forming a job description, it is necessary to refer to the professional standard.

What does a CMP master do?

The foreman ensures that the team fulfills the production plan on time and with the quality required by the construction technology.

When accepting work he takes the necessary measurements, interacts with the construction laboratory, fills in quality documentation.

General provisions of the instruction

The section should be filled with information about in which company and in what position the employee works, to whom he reports and whom he manages himself, how he can be appointed or dismissed from his position, as well as the rules related to replacing an employee in case of his absence from the workplace .

An additional plus for the quality of the job description will be the inclusion in this section of information on the interaction of a specialist with other departments of the organization and a list of documentation that he must use when performing his functions.

Responsibilities and tasks

The main task of the foreman is the organization and control of the work process performed by a team of workers according to a specific technical task or technological map: from setting a task to accepting the final result.

Let's list the responsibilities and expand each of them in detail.

Requirements for a specialist

To form this section, it is necessary to study additionally the requirements of the standard and correctly describe them in the job description.

Education and work experience

For the position of master of construction and installation works, it is established several mandatory requirements regarding the level of education and experience.

If the education has a construction specialization or it does not have one, but the employee received an additional specialized qualification, three years of experience is sufficient.

If there is no specialization at all, then the employee must have five years of work experience.

Required knowledge and skills

It is important to reflect in the job description requirements for the skills and knowledge of the master of construction and installation works in accordance with the functions of the post. They determine how much knowledge and skills employees should have.

Construction and installation master must know the normative documentation on the processes of organization and production of construction works, rules for issuing as-built documentation, the main characteristics and technology for conducting incoming quality control of building materials, requirements for calculating shift production tasks and preparing reports on their implementation, methods for identifying production reserves.

The key skills of the foreman include the following skills: to organize the construction process in accordance with the requirements of technology, draw up as-built documentation, plan material and technical resources and timely create requests for their supply, maintain schedules for the implementation of the plan, generate reports on the implementation of production tasks.

Responsibility and rights

This section of the manual defines area of ​​​​responsibility of the master of construction and installation works and its main powers.

Employee is responsible for the quality and timing of the production plan, compliance with the requirements imposed on safe working conditions, causing material or other damage to the company.

The employee has the right to get acquainted with the orders of the company's management, prepare proposals for improving the activities of the construction site, interact with the company's employees to resolve work issues, stop the production process if equipment malfunctions or poor quality building materials are detected.

Pros and cons of work

The first plus is it is a career development opportunity. The position of the foreman, in fact, is the starting point for specialists seeking to lead the construction site. And in order to become the head of the site, you need to gain experience as a foreman and superintendent. Further career growth can continue to the level of chief engineer.

The second advantage is the demand for masters in the labor market, since companies are constantly in search of engineers. Employers are actively attracting young professionals to cooperate, inviting students to their companies for internships, and those who have proven themselves are ready to be hired immediately after graduation. Special training and development programs are being developed for young professionals.

But, despite such opportunities, it is important to know about the disadvantages that exist in the work of the master.

These include:

  1. Rotational work, although for some specialists this schedule is even an advantage.
  2. In some industries, the seasonal nature of work, for example, in road construction in winter, for the master most often there are no working volumes.
  3. Not very comfortable working conditions, since it is often necessary to work outside in different weather conditions.
  4. The presence of financial responsibility, but for those who would like to develop further, this should not come as a big surprise or a heavy burden.

When creating a job description, it is important to describe in sufficient detail all the necessary information, since it is created in order to regulate the working interaction between the employer and the employee and prevent disputes and disagreements over the employee's compliance with the company's requirements.

Your attention is a motivating video about a person who has devoted almost all his life to this profession.

Name of organization I APPROVE THE JOB Name of the position INSTRUCTIONS of the head of the organization _________ N ___________ Signature Explanation of the signature Place of compilation Date

1. GENERAL PROVISIONS

1. The master of construction and installation (repair and construction) works belongs to the category of managers, is hired and dismissed from work by order of the head of the organization.

2. A person who has a higher technical education without presenting requirements for work experience or a secondary specialized (technical) education and work experience in construction organizations for at least 3 years is appointed to the position of a foreman of construction and installation (repair and construction) works. In the absence of special education - a school of masters and work experience in construction for at least 5 years.

3. In his activities, the master of construction and installation (repair and construction) works is guided by:

Regulatory documents on the issues of the work performed;

Methodological materials relating to relevant issues;

the charter of the organization;

Labor regulations;

Orders and instructions of the head of the organization (direct supervisor);

This job description.

4. The master of construction and installation (repair and construction) works must know:

Decrees, orders, orders of higher authorities and other guidance, methodological and regulatory materials relating to the activities of construction sites;

Technology and organization of construction production;

Design and estimate documentation for facilities under construction;

Construction norms and rules (SNiPs), technical conditions for the production and acceptance of construction and installation works;

Regulations on collective and team contracts and methods of economic calculation of the site and teams;

Fundamentals of economics, organization of labor and management, principles of planning work on the site;

Uniform norms and prices, current regulations on the remuneration of workers;

Technical characteristics of the construction machines used, mechanized tools, fixtures;

Best practices in the organization of construction production;

Basics of labor legislation;

Rules and norms of labor protection, fire safety.

5. During the absence of the foreman of construction and installation (repair and construction) works, his duties are performed in the prescribed manner by the appointed deputy, who is fully responsible for their proper performance.

2. JOB RESPONSIBILITIES

6. To perform the functions assigned to him, the foreman of construction and installation (repair and construction) works must:

6.1. Ensure the fulfillment of construction and installation (repair and construction) tasks at the foreman's site in accordance with the working drawings, the project for the production of works, production assignments and regulatory documents.

6.2. Monitor compliance with the technological sequence of work and ensure their proper quality.

6.3. Carry out, if necessary, marking work, geodetic control during the execution of technological operations and measurements of the volume of construction and installation (repair and construction) work.

6.4. Organize the acceptance of materials, structures, products, their storage, accounting and reporting.

6.5. Ensure the rational use of construction machines, mechanisms, vehicles on the site (object), economical use of materials.

6.6. Arrangement of teams and units that are not part of them and individual workers on the site, set production tasks for them, and carry out production briefings for workers.

6.7. Issue orders, accept completed work, issue orders for completed work, draw up documents for recording working hours, output, downtime.

6.8. Organize operational accounting of the daily performance of production tasks and the receipt of building materials, structures, products.

6.9. Carry out work on the introduction of brigade and collective contracts, create conditions for the development and implementation of existing production standards by workers.

6.10. To make proposals on the assignment of categories to workers, the acquisition of the quantitative and professional-qualification composition of the brigades.

6.11. Monitor the provision of brigades and individual workers with tools, devices, small-scale mechanization, transport, overalls, protective equipment.

6.12. Participate in the work of the commission for certification of workplaces.

6.13. To acquaint workers with safe methods of performing work, instruct them directly at the workplace with a record of this in a special log book for instructing workers.

6.14. Ensure the use in accordance with the purpose of technological equipment (scaffolding, scaffolding, protective devices, fastenings of the walls of pits and trenches, struts, conductors and other devices), construction machines, power plants, vehicles and means of protecting workers.

6.15. Monitor compliance with the norms for carrying heavy loads, providing workplaces with safety signs, warning signs and posters.

6.16. Do not allow unauthorized persons to be present at workplaces, in sanitary facilities and on the territory of the site.

6.17. Ensure cleanliness and order at workplaces, in aisles and access roads, proper maintenance and operation of crane runways.

6.18. Every day before the start of work, check the state of labor protection at the site and take measures to eliminate the identified shortcomings, systematically conduct conversations with workers to analyze cases of violations of the rules and norms of labor protection.

6.19. Monitor compliance by workers with instructions on labor protection, production and labor discipline.

6.20. Analyze the economic activity of the site, control the expenditure of the wage fund.

6.21. Organize the introduction of advanced methods and techniques of labor, advanced training of workers.

6.22. Participate in the development of the collective agreement and the implementation of its activities.

6.23. Carry out educational work in a team, submit proposals for bonuses to distinguished workers, imposition of disciplinary sanctions on violators of production and labor discipline.

6.24. Exercise control:

Fulfillment by subordinate employees of official duties on labor protection;

Compliance with the requirements of labor protection legislation by employees.

6.25. Conduct, in accordance with the established procedure, primary at the workplace, repeated, unscheduled and targeted briefings on labor protection with employees.

6.26. To carry out in due time measures for labor protection, instructions of state supervision and control bodies, labor protection services.

6.27. Train workers in safe work practices and practices.

6.28. In the event of an accident at work, organize first aid to the victim, report the accident to the immediate supervisor, and take other measures provided for by the Rules for the Investigation and Recording of Accidents at Work and Occupational Diseases.

6.29. Carry out self-control of compliance with labor protection requirements.

3. RIGHTS

7. The master of construction and installation (repair and construction) works has the right to:

7.1. Get acquainted with the draft decisions of the organization's management regarding its activities.

7.2. Submit proposals for improvement of the work related to the responsibilities provided for in this instruction for consideration by the management.

7.3. Sign and endorse documents within their competence.

7.4. To interact with the heads of all structural divisions of the organization, to receive information and documents necessary for the performance of official duties.

7.5. Submit for consideration by the head of the organization ideas about the appointment, transfer, dismissal of employees subordinate to him, proposals for their encouragement or the imposition of penalties on them.

7.6. Require the management of the organization to assist in the performance of their duties and rights.

7.7. Take part in the discussion of labor protection issues submitted for consideration by meetings (conferences) of the labor collective (trade union organization).

4. RELATIONSHIPS (LINKS BY POSITION)
8. The master of construction and installation (repair and construction) works is subordinate to ______________________________________________________________. 9. The foreman of construction and installation (repair and construction) works interacts on issues within his competence with employees of the following structural divisions of the organization: - from _________________________________________________________________: receives: ________________________________________________________________________________; presents: __________________________________________________________________________; - from _________________________________________________________________: receives: __________________________________________________________________; presents: __________________________________________________________________________.
5. PERFORMANCE EVALUATION AND RESPONSIBILITY

10. The work of the foreman of construction and installation (repair and construction) works is evaluated by the immediate supervisor (another official).

11. The foreman of construction and installation (repair and construction) works is responsible for:

11.1. For non-fulfillment (improper fulfillment) of their official duties provided for by this job description - within the limits determined by the current labor legislation of the Republic of Belarus.

11.2. For offenses committed in the course of carrying out their activities - within the limits determined by the current administrative, criminal and civil legislation of the Republic of Belarus.

11.3. For causing material damage - within the limits determined by the current labor, criminal and civil legislation of the Republic of Belarus.

11.4. For non-compliance with the rules and norms of labor protection, safety, industrial sanitation and fire protection - in accordance with the requirements of regulatory legal acts of the Republic of Belarus and local acts in _____________________.

Name of the position of the head of the structural unit _________ _______________________ Signature Full name of the signature of the Visa I am familiar with the instruction _________ _______________________ Signature Full name of the signature _______________________ Date

Unified qualification directory of positions of managers, specialists and other employees (CEN), 2019
Section "Qualification characteristics of positions of employees of nuclear energy organizations"
The section is approved by the Order of the Ministry of Health and Social Development of the Russian Federation of December 10, 2009 N 977

Master of construction and installation works

Job responsibilities. Ensures the implementation of the plan of construction and installation works on the headed site. Controls compliance with the production technology. Carries out measures to prevent marriage and improve the quality of work, the use of reserves to increase labor productivity. It performs the necessary marking work, geodetic control during the execution of technological operations and measurements of the volume of construction and installation works. Organizes the acceptance of materials, structures, products, their storage, accounting and reporting. Provides rational use of construction machines, equipment and vehicles on the site, economical use of materials. Creates conditions for the development and implementation of existing production standards by employees. Arranges brigades, links and individual workers on the site, sets production tasks for them, and provides production briefings. Issues orders, accepts completed work, draws up documents for recording working hours, output, downtime. Monitors the provision of brigades and individual workers with tools, devices, small-scale mechanization, transport, overalls, protective equipment. Ensures the use in accordance with the purpose of technological equipment (scaffolding, scaffolding, protective devices, fastenings of the walls of pits and trenches, struts and other devices), construction machines, power plants, vehicles and means of protecting workers. Controls the provision of workplaces with safety signs, warning signs and posters. Ensures cleanliness and order at workplaces, in sanitary facilities, in aisles and access roads, proper maintenance and operation of crane runways. Controls the observance by employees of production and labor discipline, labor protection rules.

Must know: laws and other regulatory legal acts of the Russian Federation, methodological and regulatory documents relating to the activities of construction sites; technology for the production of construction and installation works; principles of work planning on the headed area; technical characteristics of the construction machines used, mechanized tools, fixtures, basic geodetic tools; norms and prices for the work performed; wage regulations; basics of the organization of construction production; design and estimate documentation for facilities under construction; construction norms and rules, technical conditions for the production and acceptance of construction and installation works; requirements for the secrecy regime, the preservation of official, commercial and state secrets, non-disclosure of confidential information; fundamentals of economics, organization of labor and management; fundamentals of labor legislation; environmental regulations; rules on labor protection and fire safety; internal labor regulations.

Qualification requirements. Higher vocational (technical) education and work experience in the field of professional activity for at least 1 year or secondary vocational (technical) education and work experience in the field of professional activity for at least 3 years.

1. General Provisions

1.1. The master of construction and installation works belongs to the category

leaders.

1.2. For the position of master of construction and installation works

a person with a higher technical education is appointed without presenting

requirements for work experience or secondary special (technical)

education and work experience in construction organizations for at least 3 years.

1.3. Appointment to the position of master of construction and installation works

and dismissal from office is carried out by order (instruction)

the head of the organization.

1.4. The master of construction and installation works must know:

- resolutions, orders, orders of higher authorities and others

guidance methodological and regulatory materials on activities

construction sites

– profile, specialization and development prospects of the organization

– technology and organization of construction production

— design and estimate documentation for facilities under construction

– technical regulations, building codes and regulations, technical

conditions for the production and acceptance of construction and installation works

– principles of planning work on the site

- the current regulation on the remuneration of employees of the organization

(norms and prices for the work performed) and forms of material

stimulation

– technical characteristics of the construction machines used,

mechanized tools, fixtures

– best practices in the field of construction

— fundamentals of economics, organization of labor production and management

— fundamentals of economic legislation

— fundamentals of the labor legislation of the Russian Federation

- internal labor regulations

— rules and regulations of labor protection, safety measures,

industrial sanitation and fire protection

– techniques and methods of providing pre-hospital medical care

1.5. Master of construction and installation works in his activity

guided by:

- the charter of the organization

- this job description

— _________________________________________________________________.

(other documents)

1.6. Master of construction and installation works directly

reports to the head of the organization.

1.7. During the absence of the master of construction and installation works

(business trip, vacation, illness, etc.) his job responsibilities

is performed by an employee appointed in accordance with the established procedure, who

acquires the corresponding rights and is responsible for non-fulfillment

or improper performance of the duties entrusted to him in connection with

substitution.

1.8. ______________________________________________________________.

2. Functions

2.1. Ensuring the implementation of the construction and installation work plan for

2.2. Organization of operational accounting for the implementation of production

assignments and receipt of building materials, structures, products.

2.3. Management of site employees.

2.4. Providing workers with tools, equipment,

means of small-scale mechanization, transport, overalls, protective

means.

2.5. Monitoring compliance with safety regulations by employees

performance of technological operations for the production of construction works.

3. Job responsibilities

The master of construction and installation works performs the following

duties:

3.1. Ensures the implementation of the plan of construction and installation works on

site in accordance with the working drawings, the project for the production of works,

production plan and regulations.

3.2. Controls compliance with the technological sequence

construction works and ensuring their proper quality.

3.3. Performs, if necessary, marking work, geodetic

control during the execution of technological operations and measurements of volumes

construction and installation works.

3.4. Organizes the acceptance of materials, structures, products, their

warehousing, accounting and reporting.

3.5. Provides rational use on the site (object)

construction machines, mechanisms, vehicles, economical

consumption of materials.

3.6. Produces the placement of brigades and units that are not part of them

and individual workers on the site, establishes their production

tasks, provides production briefing.

3.7. Issues orders, accepts completed works, issues orders

for the work performed, draws up documents on the accounting of working hours,

production, downtime.

3.8. Manages day-to-day accounting

production tasks and receipt of building materials,

structures, products.

3.9. Provides conditions for the development and implementation of employees

established production standards.

3.10. Submits proposals for assignment to the head

categories to employees, acquisition of quantitative and

professional and qualification composition of the brigades.

3.11. Provides crews and workers with tools,

devices, means of small-scale mechanization, transport, overalls,

protective means.

3.12. Participates in the work of the commission for attestation of workplaces.

3.13. Conducts safety training

production of works.

3.14. Ensures the maintenance of a log of employee briefings.

3.15. Ensures application as intended

technological equipment (scaffolding, scaffolding, protective devices,

fastenings of the walls of pits and trenches, struts, conductors and other

devices), construction machines, power plants, transport

means and means of protection for workers.

3.16. Controls the provision of workplaces with safety signs,

warning signs and posters.

3.17. Does not allow presence in the workplace, in

sanitary premises and on the territory of the site of unauthorized persons.

3.18. Ensures cleanliness and order in the workplace

aisles and access roads, proper maintenance and operation

crane tracks.

3.19. Checks the state of safety and takes action to

elimination of identified deficiencies.

3.20. Participates in the work of the commission for the investigation of accidents

accidents at work and violations of safety regulations.

3.21. Monitors employee compliance with safety instructions

labor, production and labor discipline.

3.22. Organizes professional development of employees.

3.23. _____________________________________________________________.

(other duties)

The master of construction and installation works has the right to:

4.1. Participate in the discussion of draft management decisions

organizations on issues related to its activities.

4.2. Dispose of the funds and property entrusted to him with

compliance with the requirements defined by legislative and regulatory

legal acts, the charter of the organization.

4.3. Sign and endorse documents within your

competencies.

4.4. Initiate and conduct meetings on organizational and

financial and economic issues.

information, documents.

4.6. Conduct quality and timeliness checks

instructions.

4.7. Demand the termination (suspension) of work (in case of

violations, non-compliance with established requirements, etc.), compliance

established norms, rules, instructions give instructions for correcting

shortcomings and elimination of violations.

4.8. Submit to the head of the submission organization

on the hiring, transfer and dismissal of employees, on the encouragement of those who have distinguished themselves

employees and on the application of disciplinary sanctions against employees,

violating labor discipline.

4.9. Require the management of the organization to provide assistance in

performance of their duties and rights.

4.10. _____________________________________________________________.

(other rights)

5. Responsibility

5.1. The master of construction and installation works is responsible for:

- for improper performance or non-performance of their official duties

duties as set out in this job description

within the limits determined by the current labor legislation of the Russian

Federations

- for offenses committed in the course of exercising their

activities, - within the limits determined by the current administrative and

criminal legislation of the Russian Federation

- for causing damage to the organization - within the limits established

current labor, civil and criminal legislation

Russian Federation.

5.2. The master of construction and installation works bears a personal

responsibility:

— for the results and efficiency of production activities

area under his supervision

- for the consequences of an unreasonable decision taken by him, which entailed

a violation of the safety of property, its illegal use

or other damage to the organization.

5.3. ______________________________________________________________.

Now in every city there is an active construction of shopping centers, multi-storey buildings, sports grounds, in the private sector there is a busy construction of cottages. This indicates the rapid development of the construction industry. Of course, the demand for specialists increases with the increase in construction sites, but not everyone is able to devote themselves to this industry.
The construction of new public and residential buildings, the reconstruction of old buildings, the arrangement of communications, the repair of bridges and the laying of roads require high professionalism and certain skills.

Master of construction and installation works

Both the strength of the facility and the safety of people, both the builders themselves and ordinary civilians for whom the work is being performed, will depend on the quality of these parameters.

Structure of construction and installation works

A set of sequential actions and means of execution aimed at the construction or reconstruction of production and non-production facilities, the installation of various types of equipment, is included in the concept of construction and installation work.

A carefully planned construction process allows you to avoid shortcomings and errors, prevent alterations and corrections and, as a result, correctly calculate the cost of construction and installation services (http://3proraba.com.ua/calculator/item/cat/ctroitelno-montajnue-rabotu). There is no clear distinction between construction and installation work, since in fact these two areas are inextricably linked and tend to flow into each other.

Conventionally, there are 4 types of construction and installation works:

General construction. Cover the largest amount of work. These include: engineering preparation of the construction site; earthen, pile, stone works; erection and installation of all types of structures; carpentry, roofing and painting; building cladding; arrangement of territories.

Special. These construction works are associated with the use of special materials or with the installation of individual systems and devices. For example, the application of anti-corrosion coatings, the laying of structured cable networks, the construction of mine shafts, the installation of elevators, sanitary systems, etc.

Transport. Delivery to the territory of the construction site of the necessary materials, finished products, construction equipment, parts and fixtures is implied.

Loading and unloading. This includes the transport of materials around the construction site using lifting and transport equipment or human labor. For example, transportation of soil, concrete mixture, steel, wood, reinforced concrete products, etc.

Who provides the construction process?

The management of construction and installation works and ensuring the continuous process of their production is entrusted to specialists who:

  • have the appropriate education;
  • have a high degree of qualification and responsibility;
  • have sufficient experience in a particular field;
  • are interested in the development of technology and production.

With insufficient experience in construction work, developers attract more competent persons as part of general contractors. Highly specialized specialists organize the construction process in accordance with applicable regulations and standards. Their competence includes strict control and optimization of construction and installation works in all respects. General contractors provide planned construction on the basis of an existing project approved by the customer.

Job description for the master of construction and installation works

It is quite difficult to learn the profession of a general construction worker, but it is quite possible. To do this, you just need to become a skilled worker, able to perform any simple action, from stone, furnace, electric welding to installation of structures, concrete and loading and unloading operations. In addition, the master must be able to manually dismantle foundations, destroy brickwork and other monumental structures, while observing safety instructions.

How to Become a General Worker on a Construction Site

Most building trades are taught in colleges. Future masters of general construction works learn the basics of their specialty at their desks, in laboratories and in practical classes under the guidance of experienced teachers and practicing teachers. Upon admission to the school, young people are interviewed to identify the features of the applicants that the future master of general construction works should have, namely:


Upon graduation, the specialist must know:

  • What are the main types of materials;
  • How to prepare a high-quality cement mortar;
  • Technological process of laying bricks;
  • How to care for fixtures, tools and equipment;
  • The basics of the work of a slinger, electric and gas welder and stove-maker.

Only in this case, the first entry will appear in the young specialist's work book: 270802.09 "Master of general construction works."

The specialty of the master of general construction works has the following qualifications:

  • Fitting worker;
  • concrete worker;
  • Mason;
  • Pechnik;
  • Slinger;
  • Electric welder of manual welding;
  • Assembler for the installation of steel and reinforced concrete structures.

Read more about who can work as a general construction worker, read below.

What are the responsibilities of a concrete fitter?

Where to study for a master of general construction works, of course, but where to acquire the specialty of an installer of steel and reinforced concrete structures?

Naturally, in one of the many colleges, but also in short courses and during communication with colleagues on a construction site. In the process of work and improvement of skills, the installer participates in the construction of buildings from imported blocks and levels the joints of the panels with cement mortar. Using tools, he levels the blocks and lifts the panels, giving them a certain position. Having fixed the panels, the concrete worker welds them with the neighboring ones, fills the seams with mortar, and then proceeds to the installation of the next element.

Increased requirements are imposed on the installer for the installation of steel and reinforced concrete structures:

  • Endurance and remarkable strength;
  • No problems with the vestibular apparatus;
  • Spatial orientation;
  • No fear of heights;
  • Coordination;
  • Excellent eye gauge;
  • Caution.

Functions of a mason

The specialty of the SPO Master of General Construction Works provides for the qualification skills of a bricklayer - an employee who plays an important role in the construction, operation and repair of residential buildings, industrial facilities, bridges and other structures. To be a bricklayer, it is necessary to have endurance combined with body mobility, lack of fear of heights, an eye, spatial imagination, mathematical thinking, visual-review memory and steady attention.

The bricklayer performs the following types of work:

  1. Mounts ceilings, reinforced concrete beams, slabs and other prefabricated elements in brick houses;
  2. Fills seams in prefabricated reinforced concrete structures;
  3. Mounts / dismantles all types of stone vaults;
  4. Restores brick walls and changes the foundation of buildings;
  5. Installs ventilation units.

At the same time, he successfully uses both manual and mechanized devices in his daily activities.

The work of a concrete worker at a construction site

Only a concrete specialist is able to concrete prefabricated and monolithic structures, only he will produce ceilings, panels, flights of stairs, slabs and so on with an accuracy of a millimeter. A concrete worker will not be able to become a real specialist if there are medical contraindications, such as:

  • Diseases of the respiratory organs;
  • Decreased auditory and visual sensitivity;
  • Chronic inflammatory processes;
  • Pathologies of the cardiovascular system;
  • Changes in the musculoskeletal system;
  • Brain and nervous diseases.

These deviations can affect the physical form, endurance, color discrimination, eye, spatial imagination, concentration and attention of the concrete worker, without which it is impossible to achieve the highest ranks in his profession.

What is the job of a baker?

Laying stoves, fireplaces, stoves, chimneys and fireplace hearths for various purposes, lining products, lining fireboxes with refractory bricks, installing and replacing stove control devices - all these are the functions of a stove-setter. In addition, the baker is engaged in:

  • Finishing vaults in boilers of fire-tube and water-tube systems;
  • Repair of fireplaces, stoves and exhaust pipes;
  • Replacement of masonry tiles;
  • Re-equipment of wood stoves for gas supply;
  • Preparation of clay solutions.

For a stove maker, fundamental knowledge of classical school subjects, possession of primary labor skills - carpentry, plumbing and construction are very important. Information from materials science, heat engineering, natural history is also needed, not to mention the ability to lay and disassemble stoves, select tiles, check the quality of bricks and the consistency of mortars.

What are the tasks of a fitter

Rebar is the common name for the profession of a manufacturer of reinforcing meshes and frames. The master is engaged in the manufacture of frames for reinforced concrete structures, welds and / or connects the elements of products using special seam machines operating in automatic or semi-automatic modes. Also, the specialist is engaged in the adjustment of these units, monitors the serviceability of welding devices.

In preparation for independent work, the fitter accumulates a lot of knowledge that sooner or later he needs to work on a construction site:

  • Grades and properties of steels;
  • Scopes of steel products;
  • Reading drawings for the manufacture of reinforcing meshes;
  • Fundamentals of electrical engineering;
  • Schematic drawings of welding units;
  • Types of welded joints;
  • Methods for performing arc welding;
  • Methods for testing and monitoring compounds.

What is interesting about the work of a slinger

The specialty of the master of general construction work also includes mastering the skills of a slinger. If necessary, the foreman of general construction works, without prejudice to the activities of the entire construction team, can replace the slinger and take on the fastening of goods transported to a height by lifting mechanisms. In Russian, the concept of "sling" (loop) came from maritime affairs, where it was a device for hanging various loads on traverses and hooks. The slinger at the construction site is busy tying cargo, clinging it to the hooks of cranes and monitoring the position of the cargo during transfer, after which, upon arrival at the site, unhooks it along with the slings.

The slinger has a great responsibility, because a poorly secured load is able to fall on the heads of workers and even turn over the lifting device. This is especially true for large-area cargo. They have a large windage, and therefore a strong wind is able to rip them off or shake them strongly. No less dangerous are moving machines and parts of mechanisms. These and other nuances of the work of slingers became the reason for the necessary annual recertification.

work experience

September 2013 - present (4 years and 9 months)

Entrepreneur - Sole Proprietorship

Provision of services.

Construction, electrical welding works, welding of plastic pipes.

Master of construction and installation work - Inflow of Ryazan

Construction. 20 people in charge

Responsibilities, functions, achievements

Construction and reconstruction of bridges in Moscow. Construction of housing stock in Ryazan.

Construction and installation master — SGK-Automation

Construction. 16 people in charge

Responsibilities, functions, achievements

Construction of the State Border Service in the city of Synya. Maintaining those documentation.
Construction of foundations in accordance with POR, arrangement of MK and reinforced concrete structures in accordance with POR.

SMR Brigadier. SMR master. — SevZapSpetsStroyMontazh

Construction. 30 people in charge

Responsibilities, functions, achievements

Construction of el. substations in Volokolamsk from zero cycle to start-up. Reconstruction of an electrical substation in Kolpino. Maintenance of those documentation. Construction of foundations in accordance with POR, arrangement of MK (including assembly and installation of MK of a power transmission line support) and reinforced concrete structures in accordance with POR. The device of roads on el.substation.

Work under the contract - OJSC "SevZapElectroSetStroy"

Construction. Supervised by 5 people

Responsibilities, functions, achievements

Reconstruction of el. substations in Moscow. Maintaining those documentation.
Construction of foundations in accordance with POR, arrangement of MK and reinforced concrete structures in accordance with POR.

Foreman of construction and installation works - SeverStroyMontazh-NN

Construction. 28 people in charge

Responsibilities, functions, achievements

Construction of a shop at a metallurgical plant in Cherepovets. Construction of a gas station in Gryazovets. Reconstruction of the GPS in Vuktyl. Maintaining those documentation.
Construction of foundations in accordance with POR, arrangement of MK and reinforced concrete structures in accordance with POR.

Cement equipment repairman – Mordovian Cement Plant

Production.

Job Descriptions

18 people in charge

Responsibilities, functions, achievements

Repair of mechanical equipment at the cement plant. Maintaining those documentation.

Mechanic. Section chief. Deputy foreman - VTSZ-Vorkuta cement plant

Production. 32 people in charge

Responsibilities, functions, achievements

Repair of mechanical equipment at the cement plant.

Maintaining those documentation.

Repairman, gas cutter, electric gas welder — VTSZ-Vorkuta Cement Plant

Job descriptions taking into account professional standards 2016-2017

Construction site foreman job description sample

A sample job description is drawn up taking into account the professional standard Organizer of construction production

1. General Provisions

1.1. The foreman of the construction site belongs to the category of managers.

1.2. The following person is accepted for the position of a construction site foreman:

1) having a secondary vocational education (training programs for mid-level specialists, additional professional programs - advanced training programs, professional retraining programs), who have completed advanced training in the direction of professional activity in the field of construction at least once every five years;

2) having work experience in the area of ​​professional activity:

At least three years in the presence of secondary vocational education in the profile of professional activity in the field of construction;

At least three years in the presence of non-core secondary vocational education and additional professional education with the assignment of additional qualifications in the direction of professional activity;

At least five years (for vocational training).

1.3. The foreman of the construction site must know:

1) requirements of regulatory technical documents for the production of the same type of construction work;

2) regulatory requirements for the need for the production of the same type of construction work in material and technical resources;

3) requirements of regulatory technical and design documentation for the composition and quality of performance of the same type of construction work;

4) requirements of regulatory technical and design documentation for the composition and content of operational control of construction processes and production operations;

5) types and properties of basic building materials, products and structures;

6) types and characteristics of the main construction equipment and tools;

7) types and characteristics of construction machines, power plants, vehicles and other equipment;

8) rules for transportation, warehousing and storage of various types of materials and components;

9) principles of organization of complex and specialized production units and teams;

10) technology for the production of the same type of construction work;

11) the procedure for the development and approval of production targets and plans for the production of the same type of construction work (operational plans, plans for resource requirements, schedules);

12) methods for calculating the labor and material and technical resources necessary to fulfill the volumes provided for by the production tasks and calendar plans for the production of the same type of construction work;

13) requirements of technical documents that determine the composition and procedure for arranging a construction site (on-site preparatory work);

14) types and technical characteristics of technological equipment (scaffolding, scaffolding, protective devices, fastenings of the walls of pits and trenches);

15) rules for the maintenance and operation of machinery and equipment;

16) the procedure for compiling reporting documentation (sheet of consumption of building materials) on the use of material assets;

17) requirements of technical documents and project documentation for the procedure for carrying out and technology for carrying out the same type of construction work;

18) methods of operational planning for the production of the same type of construction work;

19) methods for determining the types, complexity and volumes of the same type of construction work and production tasks;

20) operational quality control schemes;

21) methods and means of instrumental quality control of the results of the production of the same type of construction work;

22) rules for documenting the results of construction quality control, provided for by the current standards for the acceptance of construction work;

23) methods, means of detection and prompt elimination of imperfections and defects in the results of the production of the same type of construction work (use of alternative methods of work, tools, materials and components);

24) methods for calculating the main indicators of the efficiency of production and economic activities;

25) criteria for assessing the effectiveness of production and economic activities;

26) the main factors for increasing the efficiency of the production of the same type of construction work;

27) types of negative impact on the environment during the production of various types of construction work and methods for minimizing and preventing them;

28) the main harmful and (or) dangerous production factors;

29) requirements for workplaces and the procedure for organizing and conducting a special assessment of working conditions;

30) rules for maintaining executive and accounting documentation in the course of construction work;

31) regulatory requirements for the number and professional qualifications of workers in the production site of the same type of construction work;

32) basic principles and methods of managing labor collectives;

33) methods of conducting normative control of the fulfillment of production tasks and individual works;

34) the main forms of organizing vocational training at the workplace;

35) basic measures to encourage employees, types of disciplinary sanctions;

36) grounds and measures of administrative and criminal liability for violation of labor legislation;

37) basic requirements of labor legislation, rights and obligations of employees;

38) rules on labor protection and fire safety in the production of the same type of construction work;

39) requirements of regulatory documents in the field of environmental protection;

40) Internal labor regulations, job descriptions;

41) labor protection requirements and fire safety rules;

42) rules for maintaining documentation on monitoring the fulfillment of requirements for labor protection, fire safety and environmental protection;

43) measures of administrative and criminal liability applied in case of violation of the requirements of labor protection, fire safety and environmental protection;

44) ……… (other documents, materials, etc.)

1.4. The foreman must be able to:

1) to assess the compliance of the volumes of production tasks and calendar plans for the production of the same type of work with regulatory requirements for labor and material and technical resources;

2) carry out planning and marking of the site for the production of the same type of construction work;

3) determine the composition and scope of auxiliary work on the preparation and equipment of the site for the production of the same type of construction work;

4) determine the range and calculate the volume (quantity) of building materials, structures, products, equipment and other types of material and technical resources in accordance with the production tasks and calendar plans for the production of the same type of construction work;

5) to carry out documentary, visual and instrumental quality control of building materials, structures, products, equipment and other types of material and technical resources;

6) to carry out documentary accounting of material and technical resources;

7) develop and control the implementation of calendar plans and schedules for the production of the same type of construction work;

8) determine the types and complexity, calculate the volume of production tasks in accordance with the available material, technical and other resources, specialization and qualifications of teams, links and individual workers;

9) determine the compliance of the technology and the results of ongoing similar construction work with project documentation, regulatory technical documents, specifications, technological maps and work process maps;

10) to carry out documentary support for the production of the same type of construction work (journals of the production of work, timesheets, acts of work performed);

11) exercise control over compliance with technological regimes established by technological maps and regulations;

12) carry out a comparative analysis of the compliance of operational control data of individual construction processes and (or) production operations with the requirements of technological maps and regulations;

13) to carry out visual and instrumental quality control of the results of the production of the same type of construction work;

14) carry out a comparative analysis of the compliance of quality control data of the results of the production of the same type of construction work with the requirements of regulatory technical and design documentation;

15) to carry out documentary support of the results of operational quality control of work (journal of operational quality control of work);

16) to carry out a technical and economic analysis of the production and economic activities of the site of the same type of construction work;

17) calculate the economic effect from optimizing the use of material and technical resources, increasing the level of mechanization and automation, introducing rational methods and labor techniques in the production of the same type of construction work;

18) determine the harmful and (or) dangerous factors associated with the production of the same type of construction work, the use of construction equipment and the storage of materials, products and structures;

19) determine the list of works to ensure the safety of the site for the production of the same type of construction work (fencing of the construction site, fencing or designation of hazardous areas, lighting);

20) determine the list of means of collective and (or) individual protection of workers performing the same type of construction work;

21) determine the list of jobs subject to a special assessment of working conditions;

22) draw up documentation on the implementation of labor protection rules, fire safety and environmental protection requirements (a safety briefing log, fire safety);

23) to carry out the calculation of the required number, professional and qualification composition of workers in accordance with the production tasks and calendar plans of the production site of the same type of construction work;

24) determine the optimal structure for the distribution of workers for the performance of production tasks and individual work;

25) assess the effectiveness and quality of the performance of production tasks and individual work by employees;

26) carry out an analysis of the professional qualifications of employees and determine the missing competencies;

27) carry out normative control over the fulfillment of production tasks and individual works;

28) ……… (other skills and abilities)

1.5. The master of the construction site in his activities is guided by:

1) ……… (name of constituent document)

2) Regulations on ……… (name of the structural unit)

3) this job description;

4) ……… (names of local regulations governing labor functions by position)

1.6. The foreman of the construction site reports directly to ……… (title of the position of the head)

1.7. The foreman of the construction site manages ……… (name of the structural unit)

1.8. During the absence of the foreman of the construction site (vacation, temporary disability, etc.), his duties are performed by a deputy (an employee appointed in the prescribed manner, who acquires the relevant rights and is responsible for failure to perform or improper performance of the duties assigned to him in connection with the replacement).

1.9. ……… (other general provisions)

2. Labor functions

2.1. Organization of production of the same type of construction work:

1) preparation of a site for the production of the same type of construction work;

2) material and technical support for the production of the same type of construction work;

3) operational management of the production of the same type of construction work;

4) quality control of the production of the same type of construction work;

5) increasing the efficiency of production and economic activities of the site of the same type of construction work;

6) compliance with the rules and regulations for labor protection, fire safety and environmental protection requirements in the production of the same type of construction work;

7) management of employees of the production site of the same type of construction work.

2.2. Management of subordinate employees.

2.3. ……… (other functions)

3. Job responsibilities

3.1. The Construction Superintendent has the following responsibilities:

3.1.1. As part of the labor function, preparation of a site for the production of the same type of construction work:

1) coordinates the volume of production tasks and calendar plans for the production of the same type of construction work;

2) carries out the preparation and equipment of the site for the production of the same type of construction work.

3.1.2. As part of the labor function, logistical support for the production of the same type of construction work:

1) determines the need for the production of the same type of construction work in material and technical resources;

2) exercise control over the quality and volume (quantity) of material and technical resources;

3) fulfills the application, acceptance, distribution, accounting and storage of material and technical resources.

3.1.3. As part of the labor function, operational management of the production of the same type of construction work:

1) carries out operational planning and control of the implementation of the production of the same type of construction work;

2) distributes production tasks between teams, units and individual workers;

3) exercise control over compliance with the production technology of the same type of construction work;

4) carries out the development and implementation of measures to eliminate deviations from the technological requirements for the production of the same type of construction work;

5) maintains current and as-built documentation on the types of similar construction works being performed.

3.1.4. As part of the labor function, quality control of the production of the same type of construction work:

1) exercise operational control of individual construction processes and (or) production operations;

2) carries out current quality control of the results of the production of the same type of construction work;

3) identifies the causes of deviations of the results of construction work from the requirements of regulatory, technological and design documentation;

4) carries out the development and implementation of measures aimed at eliminating and preventing the occurrence of identified defects.

3.1.5. As part of the labor function, increasing the efficiency of production and economic activities of the site of the same type of construction work:

1) evaluates the effectiveness of the production and economic activities of the site of the same type of construction work;

2) optimizes the use of material and technical resources in the production of the same type of construction work;

3) increases the level of mechanization and automation of the same type of construction work;

4) rationalize the methods and techniques of labor in the production of the same type of construction work.

3.1.6. As part of the labor function, compliance with the rules and regulations for labor protection, fire safety and environmental protection requirements in the production of the same type of construction work:

1) prepares a site for the production of similar construction works and workplaces in accordance with the rules for labor protection, fire safety and environmental protection requirements;

2) instructs employees on labor protection rules and fire safety requirements;

3) exercise control over compliance with labor protection rules, fire safety and environmental protection requirements;

4) prepares workplaces for conducting a special assessment of working conditions.

3.1.7. As part of the labor function, the management of employees of the site for the production of the same type of construction work:

1) determines the need for the production of the same type of construction work in labor resources;

2) performs the placement of employees of the site for the production of the same type of construction work at workplaces, the formation of teams and units;

3) distributes and controls the performance of production assignments and individual work by employees;

4) monitors compliance by employees of the production site of the same type of construction work with internal regulations;

5) improves the professional qualifications of employees of the production site of the same type of construction work;

6) prepare proposals on measures to encourage and punish employees.

3.1.8. As part of the labor function, the management of subordinate employees:

1) distributes labor functions, job assignments between subordinate employees and exercises control over their implementation;

2) provides subordinate employees with advisory support, gives explanations and instructions in the framework of the performance of labor functions by subordinate employees;

3) ensures compliance with labor legislation and legislation on labor protection in relation to subordinate employees, creation of working conditions that meet the established requirements;

4) resolve conflict situations between subordinate employees;

5) submits for consideration ……… (name of the position of the head) on the admission, relocation and dismissal of employees; proposals for their promotion or the imposition of penalties on them;

6) ……… (other duties)

3.1.9. As part of the performance of their labor functions:

1) carry out the instructions of his immediate supervisor;

2) undergo periodic medical examinations (examinations), as well as extraordinary medical examinations (examinations) in accordance with the procedure established by the legislation of the Russian Federation.

3.1.10. ……… (other duties)

3.2. ……… (other job descriptions)

4. Rights

The foreman of the construction site has the right to:

4.1. Participate in the discussion of draft decisions of the organization's management,

in meetings for their preparation and implementation.

4.2. Dispose of the material resources entrusted to him within the limits

competencies.

4.3. Sign and endorse ……… (types of documents)

4.4. Initiate and conduct meetings on the organization of production activities.

4.6. Initiate and conduct meetings on production and economic issues.

4.7. Conduct quality and timeliness checks on assignments.

4.8. Demand the termination (suspension) of work (in case of violations, non-compliance with established requirements, etc.), compliance with established standards; give instructions for correcting deficiencies and eliminating violations.

4.9. Get acquainted with the draft decisions of the management regarding the function performed by him, with documents defining his rights and obligations in his position, criteria for assessing the quality of the performance of his labor functions.

4.10. Participate in the discussion of issues related to their official duties.

4.11. Require the management of the organization to assist in the performance of his duties and rights.

5. Responsibility

5.1. The construction site foreman is responsible for:

For improper performance or non-performance of their official duties provided for by this job description - in the manner established by the current labor legislation of the Russian Federation;

For offenses and crimes committed in the course of their activities - in the manner prescribed by the current administrative, criminal and civil legislation of the Russian Federation;

For causing damage to the organization - in the manner prescribed by the current labor legislation of the Russian Federation.

5.2. ……… (other liability provisions)

6. Final provisions

6.1. This job description was developed on the basis of the Professional Standard "Construction Production Organizer", approved by Order of the Ministry of Labor and Social Protection of the Russian Federation of November 21, 2014 N 930n, taking into account ……… (details of the organization's local regulations)

6.2. Familiarization of the employee with this job description is carried out upon employment (before signing the employment contract).

The fact that the employee is familiarized with this job description is confirmed by ……… (signature on the familiarization sheet, which is an integral part of this instruction (in the journal of familiarization with job descriptions); in a copy of the job description kept by the employer; otherwise)

6.3. ……… (other final provisions).